As I guess, production of the Tayfun Block 1 took place over three years—from 2023 to 2025—and the units entered the inventory. Serial production of Block 2 began in early 2026, and four batches are currently in the inventory; there may also have been an LRIP batch. Alongside Block 2, Block 3 is...
Baykar can't produce a turbofan engine ( dry trust over 10.000 lbf ) alone. Cooperation is possible. They pay the money, someone else (Ivchenko etc) make the engine. TF6000 or 10000 (ab) is not enough for real/future Kızılelma. It is sure.
Old variants of Som 's (with French engine) max. range was over 300 km for hi hi lo. It has a gliding range nearly 90 km when dropped 40k feet. French engines have a limit for 17 minutes. It was a big problem. According to rumours with Ktj 3200 new range is about 500 km.
TRG300s are only 585 kg with the warhead of 105 kg. I guess Roketsan will produce a new rocket with a bigger diameter and weight. F16s can carry 2 * 1000 kg rockets. In that way we can easily exceed 500 km for ALBM class.