It is not contradictory. The daily production will increase to 10 million cubic meters in 7 months and the first phase will be completed. It will reach 40 million cubic meters in 2029 when the second phase ends.
According to conceptual studies adding external fuel tanks to KAAN proved problematic for RCS even though simulated fuel tanks have a stealth design. Drag increase for supercruise is also a problem as stealth fuel tank designs have a higher drag than legacy fuel tanks. It is less of a problem at...
The first phase of the Sakarya Gas Field project will be finished in Q1 2025 there is a slight delay even so this is nothing short of a small miracle. In the second phase, daily production will reach 40 million cubic meters.
They are inherently different. A supercapacitor provides a high current over a short time (seconds). The thrust of the electromagnetic catapult scales with the current. The higher the current the bigger the pushing force of EMALS. Supercapacitors can provide insanely high instantaneous currents...
She looks much younger than the average 60-year-old woman but that picture is edited. Here is her Instagram.
https://www.instagram.com/alejandramarisa.rodriguez/
Iran will downplay this and will probably say Iranian air defense systems repelled the Zionist regime's air raid. Iran might even downplay it further and say that Iranian air defense intercepted unknown drones.
Both the EASA aircraft type certificate and engine type certificate(TS-1400) are needed for the Gökbey helicopter. The first one progressed well but has seen delays due to the EASA inspector scheduling. The second one has recently started. Gendarmes and the ministry of health want EASA civil...