Search results

  1. M

    TR Defence Exports & Updates

    Source :
  2. M

    TR Defence Exports & Updates

    Actually, the situation with the engine is different. The Turkish engine is targeted to be ready by 2030, and work is progressing accordingly. The delivery schedule (starting from 2036–37) is determined solely based on the contract structure and production planning with Indonesia. So, it does...
  3. M

    TR Defence Exports & Updates

    These delivery dates are for Indonesia
  4. M

    TR Defence Exports & Updates

    A second contract has been signed. It is mentioned that there are two companies that will collaborate with TAI. Are there any defense industry firms owned by the Indonesian government? If so, what are their names? Are there any Turkish defense industry companies based in Indonesia? What is the...
  5. M

    TR Defence Exports & Updates

    The SSB President conveyed this information by connecting to TRT Haber's live broadcast via telephone.
  6. M

    TR Air-Force TF-X KAAN Fighter Jet

    Libya ? As a precondition for reaching an agreement with the GNA, a joint KAAN order by the LNA and GNA will be required. As for the payment, let's receive it in the form of oil — Libyan oil is of high quality.
  7. M

    TR Defence Exports & Updates

    🇹🇷🤝 🇮🇩 ✈️ With the advance payment to be made in 2032–33, an 84-month timeline will commence. The first aircraft delivery will take place 48 months after the advance payment (i.e., in 2036–37), and the final aircraft delivery will occur at the end of 84 months (i.e., in 2039–40). A similar...
  8. M

    Indonesia Casual Discussion Warkop Indonesia

    @Umigami @NEKO @norman88 In the event of a war between the United States and China in the South China Sea, which side is Indonesia more likely to support?
  9. M

    TR Air-Force TF-X KAAN Fighter Jet

    President of Defense Industry Görgün shared the image of the 2nd prototype of the national combat aircraft KAAN. I remember a news dated January 2025. I think we will see the third prototype in January 2026.
  10. M

    TR Air-Force TF-X KAAN Fighter Jet

    I think there will be a flight in September-October 2025
  11. M

    TR Defence Exports & Updates

    Products showcased at Leonardo's stand
  12. M

    TR Air-Force TF-X KAAN Fighter Jet

    Yes, that's correct. Based on the information we gathered from two different brochures, there are noticeable differences. For example, the height of PT-0 is 20 ft, while PT-1 is 16 ft. That’s a 4 ft difference, which equals approximately 121 cm. If it's not a 1:1 scale mock-up, TAI doesn't...
  13. M

    TR Air-Force TF-X KAAN Fighter Jet

    TAI General Manager Mehmet Demiroğlu: "This year, two KAANs will take flight. We're also continuing the assembly of a static prototype. The first one will be completed by the end of this year, after which its flight tests will begin. The second one will follow shortly after. So, hopefully, at...
  14. M

    TR Air-Force TF-X KAAN Fighter Jet

    KAAN jet's first flight took place on February 21, 2024, and the second flight was conducted on May 6, 2024. These flights were carried out with PT-0 prototypes, which were originally not intended to be flown. The first flight of the PT-1 prototype, which is designed to be the actual flying...
  15. M

    TR Air-Force TF-X KAAN Fighter Jet

    2030(first delivery) + 84 months
  16. M

    TR Air-Force TF-X KAAN Fighter Jet

    TAI General Manager Mehmet Demiroğlu: - "We are planning to sell 48 KAANs to Indonesia. The first delivery will be in the 2030s. Deliveries will be made with a domestic engine. It has a value between 12-15 billion dollars." @Strong AI

Follow us on social media

Top Bottom