There was a talk of selling İstifs, but it was refuted.Who is selling istif
Latest Thread
There was a talk of selling İstifs, but it was refuted.Who is selling istif
i think they will deliver it before 2030 but it would still need 1-2 years of testing before its fully commissionedCritical Threshold in MİLDEN: Construction of Test Block Begins Turkey has left another critical stage behind for the National Submarine MİLDEN. The first test block has officially begun to be constructed at Gölcük Naval Shipyard Command. National Defense Ministry Press and Public Relations Advisor Rear Admiral Zeki Aktürk, in his statement at the meeting, used the expressions, "The construction of the first test block of our National Submarine (MİLDEN) has also begun at Gölcük Naval Shipyard Command." The delivery of the first MİLDEN to the Turkish Naval Forces Command is planned before 2030.
For me having a domestic sub with VLS and AIP is a one of the 4 strategic pillars among our current projects with KAAN, AC and TF 2000.... which will represent the pinnacle of technology level we have achieved so defintly worth waitingi think they will deliver it before 2030 but it would still need 1-2 years of testing before its fully commissioned
What is a Test Block?Critical Threshold in MİLDEN: Construction of Test Block Begins Turkey has left another critical stage behind for the National Submarine MİLDEN. The first test block has officially begun to be constructed at Gölcük Naval Shipyard Command. National Defense Ministry Press and Public Relations Advisor Rear Admiral Zeki Aktürk, in his statement at the meeting, used the expressions, "The construction of the first test block of our National Submarine (MİLDEN) has also begun at Gölcük Naval Shipyard Command." The delivery of the first MİLDEN to the Turkish Naval Forces Command is planned before 2030.
Here is the answer given on line:What is a Test Block?![]()
It would be interesting to see how they test it with actual footage.Here is the answer given on line:
A test block in submarine building refers to a representative section of the submarine's pressure hull or other critical structure that is manufactured and rigorously tested to validate the materials, welding procedures, and quality control processes before full-scale construction of the actual vessel.
In other words, you can’t really start the construction until you have confirmed that you production method is correct.
A test block is manufactured and built prior to the actual submarine blocks, to test construction tolerances (shift from the actual circle), welding quality, welding distortions and heat affected zones. Also testing post-welding strength of the material and consistency of the construction rigs. Primarily a plain structural part of the pressure hull to ensure that it is suitable for bearing the crush depth. However, the section is less likely to be submerged.What is a Test Block?![]()
Yes, with as many as possible Aselsan components (light ESM, STAMP, Sonar, Torpedo countermeasures and et al.). 8 will be of this version, however contracts are signed for 2 + 2 options, by two shipyards. Dearsan (leading Ozata and Desan for all contract stage), and Istanbul Naval Shipyard.So this one is new Hisar class OPV ? İt looks like smaller version of istanbul class with in front VLS .
View attachment 78456
Let's see if we can offload the second ship to Croatia.8 will be of this version
Didnt Romania plan for two?Let's see if we can offload the second ship to Croatia.
They signed a contract for the remaining four ships with ASFAT at IDEFYes, with as many as possible Aselsan components (light ESM, STAMP, Sonar, Torpedo countermeasures and et al.). 8 will be of this version, however contracts are signed for 2 + 2 options, by two shipyards. Dearsan (leading Ozata and Desan for all contract stage), and Istanbul Naval Shipyard.
Asfat has no shipyard, they are the contractor - wrapper for Istanbul Naval Shipyard.They signed a contract for the remaining four ships with ASFAT at IDEF
Dont forget missile technology.For me having a domestic sub with VLS and AIP is a one of the 4 strategic pillars among our current projects with KAAN, AC and TF 2000.... which will represent the pinnacle of technology level we have achieved so defintly worth waiting
i know i just wanted to say that at least 6 are under contract to be build, 2 are under construction with dearsan and 4 are to be decided and an option for 2 more.Asfat has no shipyard, they are the contractor - wrapper for Istanbul Naval Shipyard.
Plan is a big word. They only requested a budget for a single ship so far. In the future as they need it, maybe, but nothing for now.Didnt Romania plan for two?