The United States Navy accepted delivery of the third landing craft of a new class Ship to Shore Connector (SSC), that intended as an evolutionary replacement for the aging LCACs (landing craft, air cushion) in U.S. service.
Delivery follows Landing Craft, Air Cushion (LCAC) 102 successful completion of Acceptance Trials with the Navy’s Board of Inspection and Survey to test the readiness and capability of the craft and to validate requirements.
“SSC provides the Navy and Marine Corps team with the capability and capacity needed to execute a range of complex missions with agility and speed,” said Capt. Cedric McNeal, program manager, Amphibious Warfare Programs, Program Executive Office (PEO) Ships. “With increases in performance and reliability, this next generation craft will meet the needs of the fleet for years to come.”
- ADVERTISEMENT - CONTINUE READING BELOW -
LCACs are built with similar configurations, dimensions, and clearances to legacy LCAC, ensuring the compatibility of this next-generation air cushion vehicle with existing well deck equipped amphibious ships, as well as the Expeditionary Transfer Dock.
The SSC program is now in serial production with LCACs 103-115 making progress on the production lines at Textron Systems in Slidell, Louisiana.
SSC training craft, LCACs 100 and 101 are in the initial operator training pipeline and are in post-delivery test and trials at Naval Surface Warfare Center Panama City Division.