I think even two TEI TF 6000 engines won't be enough for such a load. There were rumors before that it would have two engines, but I don't remember which ones.It's time to develop a turbofan version of it as a strategic bomber, with a payload of 5-6 tonnes and a flying speed of 800-900 km/h.
For this, 2x TEI TF 6000 or AI-322 engines are sufficient.
As AWACS drones, it would also make sense; Turkey needs at least 2-3 more big AWACS Aircraft.
6-8 Akinci turbofans with a very large AESA radar on the back could significantly increase Turkey's capabilities.
What about a single TF 35000 engine? Would that be suitable? Even if not, I think it would require minor modifications. And as a fighter, it would be superior to the current version with a Ukrainian engine.