Mr Demir:
"Within the scope of the project, each of Anadolu, Sedef and Sefine shipyards, is planned to construct an I-class frigate simultaneously.
The three ships are scheduled to be delivered in 36 months. TCG Istanbul, the first of the I-class frigates, has a local rate of %75. However...