Search results

  1. U

    TR Air-Force TF-X KAAN Fighter Jet

    Afaik 80 million figure for F35 is not inflation adjusted and is usd value for more than a decade ago
  2. U

    TR HÜRJET-Advanced Jet Trainer/ Light attack aircraft

    Using same F404 hürjet to make naval trainer and LCA and then going for something single engine using a TF35000 towards 2050 makes more sense to me. Using hürjet as a stepping stone. Then that single fighter jet can also be used to replace aging F16s and serve alongside KAAN, as well as being...
  3. U

    TR Air-Force TF-X KAAN Fighter Jet

    I think F16 to KAAN comparison of numbers is a bit apples to oranges. KAAN will be very expensive to operate, but it is also much larger and capable. It is better to think of it as a different class of plane. I heard about the 100~ KAAN iofficial ntention before as well. Remember we are also...
  4. U

    TR Missile & Smart Munition Programs

    That's also the reason a lot of our equipment is capped at ranges like 280km. Khan(280km) is the export version of Bora, Som J is also limited to 275km
  5. U

    TR Missile & Smart Munition Programs

    "Missile technology control regime"
  6. U

    TR Missile & Smart Munition Programs

    Can't sell tayfun, at least not publicly without risking sanctions
  7. U

    TR Attack & Utility Helicopter Programs

    He said august in interview
  8. U

    TR HÜRJET-Advanced Jet Trainer/ Light attack aircraft

    "Stealthy twin engine hürjet" is not hürjet and the airframe would have 0 common parts with the hürjet. Better just make twin engine KE or Anka 3
  9. U

    TR UAV/UCAV Programs | Anka - series | Kızılelma | TB - series

    Asked a few metallurgist friends, they are not impressed by it, the thickness of boron based coating for metal foam, for aerospace but could have good uses if it really can withstand such high temps elsewhere.
  10. U

    TR Navy Naval Programs

    I think it's sapan 2
  11. U

    TR UAV/UCAV Programs | Anka - series | Kızılelma | TB - series

    https://www.iha.com.tr/malatya-haberleri/lazer-silahlarina-karsi-hava-araclarini-koruyacak-kompozit-madde-gelistirildi-94011405 some slightly more credible source
  12. U

    TR Navy Naval Programs

    Room for 2 helicopters in hangar, was wondering about that
  13. U

    TR UAV/UCAV Programs | Anka - series | Kızılelma | TB - series

    Yes, not every single research has useful output at the end of the day, but that's not the point, you gotta build a body of research, and you never know when something may end up being useful, if this isn't applicable for UAV, it may find an entirely other industrial use
  14. U

    TR Navy Navy|News & Discussions

    They are also designed for quad pack, so eventually when quad pack hissar arrives, even if it takes like 5 years or so, these ships will be serving long years so they will be quite well balanced, in time
  15. U

    TR Navy Navy|News & Discussions

    It's really the radars and weapons that increase the price
  16. U

    TR Casual Discussion Çay Bahçesi

    Getting tired at 70 min mark and getting scored at back to back is our classic move
  17. U

    Algeria Algerian Armed Forces

    Bit off-topic but I sure do hope cooperation on defense industry is only the start of much closer relationship between Turkey and Algeria. I have discovered some stuff dating back to 1800s about invasion of France and treatment of local populace, like forcibly divorcing Turkish and Algerian...
  18. U

    Canada Navy Canada Surface Combatant (CSC) Program

    Also need to consider future, more advanced threats in the ocean. Having more vls would give room for future developments of defensive armaments, like patriot pac 3 mse being adapted to MK41
  19. U

    Canada Navy Canada Surface Combatant (CSC) Program

    Not a good time to be skimping on VLS cells. Our ongoing TF2000 destroyer design of similar size was updated to 96 from 64 VLS after the observations of Red Sea situation
  20. U

    TR Navy Navy|News & Discussions

    Oh no, TF2000 first hull shouldn't wait Istif, hopefully we can start construction before 2025.

Follow us on social media

Top Bottom