Discussions regarding technical details regarding the establishment and duty principles of the Turkish-Russian Joint Center have been completed and a memorandum has been signed. Necessary studies are underway to activate the center as soon as possible.
Tankterra: The tank is not Altay. It is more or less obvious from the driver periscopes. It looks difficult to see in the photo. We know more or less about the Leopard 2 modernization. So modernization will evolve in this direction.
As stated by @CaucasusWarReport there are soldiers of which "track was lost" from both sides. It is not exactly something to be proud of or give example with it. There are two ways for the Turkish soldier. 1 is destroy and take no prisoners and 2 is take prisoners and treat them with respect...
Under the agreement signed between Erbil and Baghdad on October 9
Organization flags were lowered in Sinjar.
The PKK transferred some of the buildings in the district center to Iraqi forces.
The PKK terrorists were given 24 hours to leave Sinjar. - Iraqi Authority
GNA doesn't have the air force that is worth of starting a large scale pilot training at the moment as the training of a pilot is very long and expensive process. First there must be some stability and infrastructure established in order to start effectively build these important parts of the...
We continue our trainings within the scope of the Military Training, Cooperation and Consultancy Agreement in order to bring the Libyan Armed Forces to international standards.
In short the serial production is at halt because of the German side not exporting the engines. He says that if somebody wants to put embargoes on Turkey the Turkish side is not saddened by the move but on opposite it is motivating Turkey even more to produce it's own engines.