GÖKBEY successfully completed two more tests.
20 thousand ft. It flew at altitude and reached its maximum service altitude.
It also successfully passed the single engine test during the flight, which was carried out with a twin engine.
Latest Thread
GÖKBEY successfully completed two more tests.
20 thousand ft. It flew at altitude and reached its maximum service altitude.
It also successfully passed the single engine test during the flight, which was carried out with a twin engine.
Mehmet Demiroğlu, Deputy General Manager of TAI Helicopters, answered Defence Turk's questions on the latest status of TAI's helicopter projects and its future targets. Demiroğlu made the following statements on the use of indigenous engines in GÖKBEYWhich engine is the Gökbey helicopter being tested with right now?
www.defenceturk.net
Hello, have a good week everyone.
GÖKBEY successfully completed two more tests.
20 thousand ft. It flew at altitude and reached its maximum service altitude.
It also successfully passed the single engine test during the flight, which was carried out with a twin engine.
They wouldn't test two unproven systems togather. This should be a test of the helicopter alone with a proven engine.Hello, have a good week everyone.
Do you know whether these tests were carried out with the domestic engine TEI TS-1400 or LHTEC T800? If the tests are carried out with the domestic engine TEI TS-1400, this is a huge positive progress.
Looks like alien tech but not comfy to wear.View attachment 63657
4 AVCI-2 Helmet integrated control systems have entered the Turkish Armed Forces inventory.
Wonder how different Avcı 2 is from TopOwl in capabilities and in indigenousness compared to the original.View attachment 63657
4 AVCI-2 Helmet integrated control systems have entered the Turkish Armed Forces inventory.
3rd bird is still missing and delivery of 3 JNGK T625s are delayed to 2024. Current delay is 1.5-2 years.Interesting that the third JNGK T625 is yet to see the sunlight. And 2 months left until end of the year.
Gökbey delivery situation has been a really big disappointment for me, it feels like another case of overpromising and underdelivering.3rd bird is still missing and delivery of 3 JNGK T625s are delayed to 2024. Current delay is 1.5-2 years.
I'm not that pessimist about it, because unlike HvKK projects, JNGK actually signed for and wants to buy much more T625s. They will eventually be delivered, and to be frank JNGK doesn't have the resources for another helicopter anyhow. But, like all others, T625 too is slowly becoming a lesson on disadvantages of overpromising.Gökbey delivery situation has been a really big disappointment for me, it feels like another case of overpromising and underdelivering.