• Forum restore complete (see latest announcement thread)

Bangladesh Navy LPC Project (Reactivated)

Gary

Experienced member
Messages
8,365
Reactions
1 22 12,887
Nation of residence
Indonesia
Nation of origin
Indonesia
BN is also aiming to get ships from the west, C-802 is less likely to be on those.
aren't C-802 NATO compliant ? We shot one of those from an ex-Dutch frigate and the Luursen FPB-57s

100_1729-tnial-mil-id.jpg


Maintenance cost of the ships quadratically increases after 10th year. The increase becomes dramatic after 30 years. (Very rough numbers, assuming the expected life is 40)

I am well aware of this, but never know the exact numbers, thanks for the info.
 

Anmdt

Experienced member
Naval Specialist
Professional
Messages
5,794
Solutions
2
Reactions
145 26,840
Nation of residence
Turkey
Nation of origin
Turkey
aren't C-802 NATO compliant ? We shot one of those from an ex-Dutch frigate and the Luursen FPB-57s

100_1729-tnial-mil-id.jpg




I am well aware of this, but never know the exact numbers, thanks for the info.
Theoretically every weapon system can be invidually used as decoupled from the CMS or command structure, thus they are platform agnostic as long as they fit.

But this is not practical, maybe applied for old vessels that is switching from analogue to digital partially, or receiving an upgrade in patches but not with a solid MLU in both cases with limited service time remained.
 

Isa Khan

Experienced member
Moderator
Messages
7,995
Reactions
73 11,133
Nation of residence
Bangladesh
Nation of origin
Bangladesh
Getting this in common for all future vessels or just for the LPCs?

I don't think they will only order for two vessels if they have chosen this one. Expecting them on our new frigate and at least on four more new LPC. Even on BNS BB.
 

Isa Khan

Experienced member
Moderator
Messages
7,995
Reactions
73 11,133
Nation of residence
Bangladesh
Nation of origin
Bangladesh
Confirmed?
According to a report published on 19th November, Bangladesh bought MLRS, AShM and air defense system from Turkey in June.

Well i am just sharing what i read in the newspaper. But i am always suspicious about any news (thanks to certain Bangladeshi defense website) until i see further confirmation from more sources or DGDP, ISPR, MoD, PM or any govt official.

Looks like a retired Brigadier General also confirmed the news about AShM on 4th September. I got another news few days ago which kinda backs this news too. I am dying to share it here but before that i must try to verify it.
 

Anmdt

Experienced member
Naval Specialist
Professional
Messages
5,794
Solutions
2
Reactions
145 26,840
Nation of residence
Turkey
Nation of origin
Turkey
Looks like a retired Brigadier General also confirmed the news about AShM on 4th September. I got another news few days ago which kinda backs this news too. I am dying to share it here but before that i must try to verify it.
That is the news related to G2G contract(s) apart from these RfPs?

It was mentioned twice, once in ASFAT & ARES MoU on OPV / FAC projects for export, another one by TAIS Director in 10th Naval Systems Seminar.

The earlier one seems to mature since it was mentioned as 'the project was expected to go full speed ahead thanks to the G2G contract signed', the latter one sounds to be under negotiation, or near to completion although he might not have told this in the presentation.
 

Isa Khan

Experienced member
Moderator
Messages
7,995
Reactions
73 11,133
Nation of residence
Bangladesh
Nation of origin
Bangladesh
Four possible reasons for cancelling the tender.
  • Financial problem
  • Not getting enough suitable proposals/responses
  • Got better offer like the news about Ada class here. KSY is expanding to build 3k tons ship.
  • Lacking the capability to build them since KSY is upgrading it's old slipway which can dock-undock 700 tons vessel max. LPC's requirement was minimum 700 tons. Though I think DEW could've done that in it's old open space.
 
Last edited:

Isa Khan

Experienced member
Moderator
Messages
7,995
Reactions
73 11,133
Nation of residence
Bangladesh
Nation of origin
Bangladesh
Alright!! The LPC project is back in action. Someone in the navy thought the same thing I did. Before this new EOI was published, I was also thinking navy should order 2 Durjoy + 2 Durgam or 2 Durjoy/Durgam + 2 Type 56 immediately to increase it's strength and deterrence against rising threat. And then this EOI was published. Quite a surprise. Second time something like this happened.

Recent MoU with Netherlands could have effect in this project.

1768198351974.png
 

Isa Khan

Experienced member
Moderator
Messages
7,995
Reactions
73 11,133
Nation of residence
Bangladesh
Nation of origin
Bangladesh
Few differences between old tender and new tender. So a slightly bigger ship and a new design? Does China have any chance in this project?

Old Tender New Tender Durjoy/Durgom Class
Length OANot less than 60mNot less than 64m64m
Full loadNot less than 700 tons720 tons (± 5%)648 tons
Max speedNot less than 27 knotsNot less than 24 knots
ComplementNot less than 60 personnelAt least 75 personnel
Sea KeepingSea State 4 & 6Sea State 5 & 7
SSM/AShM02 x 04 launchers4 x SSM
SonarN/AHull mounted (ASW variant)Bow mounted (Durgam class ASW variant)
Torpedo rangeN/AMinimum 10-12 km6-9 km (ET-52C for Durgam class ASW variant)
Endurance15 days10-15 days

New tender doesn't mention the origin of SSM/AShM like the old one. (Italy/Turkey/South Korea). But it mentions a medium range SSM/AShM. Does it mean BN is still planning for something like C-802/Atmaca?

Old

1788132911438.png


New

1788132973997.png


Also some changes in 30mm and 12.7mm gun.

Old

1788133800920.png

1788133831702.png


New

1788133304547.png

1788133327631.png


Torpedo:

1788133379779.png
 
Last edited:
Top Bottom