Navantia Shortlisted To Build Three Frigates For Polish Navy

TR_123456

Experienced member
Staff member
Administrator
Messages
4,743
Reactions
11,609
Nation of residence
Nethelands
Nation of origin
Turkey
1628248605094.png

Navantia picture.

The offer submitted by Navantia to the Polish Ministry of Defence to build three frigates in a Technology Transfer (ToT) program has been selected in a ‘short list’ along with two other finalists.​


Navantia press release




Now, Navantia will participate in the Viability Phase in order to propose a design that further adjusts to the requirements of the Armaments Inspectorate of the Polish Ministry of Defence. The final decision on the contractor is expected in 2022.




The offer presented by Navantia is based on the design of the F-100, in service for the Spanish Navy, which has been the starting point for successful export contracts to Norway and Australia.




The Miecznik program launched by the Polish Government envisages the construction of three multi-mission frigates at the local PGZ shipyard in Gdynia through a Technology Transfer (ToT) contract with an international company, a business model in which Navantia has a robust experience.

Navantia has long track in the design and construction of a wide range of frigates, with proven flexibility, therefore, to suit the needs of the Polish Navy.




The company has also proved its ability to efficiently execute different models of ToT programs that have helped develop local capabilities in shipbuilding and life cycle support. It is a business model of high added value in which Navantia has success stories through its contracts in Turkey, Saudi Arabia or Australia.

 

Follow us on social media

Top Bottom