Another testbed? I belive It will not going anywhere.How about SSNBR, Scorpene xxl with nuclear reactor
Another testbed? I belive It will not going anywhere.How about SSNBR, Scorpene xxl with nuclear reactor
6 years for 2 frigate?PT PAL just post this
View attachment 31390
6 tahun? 69 months, also 2x8 ssm vls hmmm, also the vls for sam match the prediction 56, ffbnw, maybe waiting for the vls typePT PAL just post this
View attachment 31390
Hopefully, so they could continue to build 5 th and 6 th fremm6 years for 2 frigate?
Around 2030, they already build reactor prototype in sub hull mockupAnother testbed? I belive It will not going anywhere.
I highly doubt it. Too much deviation from original Arrowhead 140.24 MR
32 LR
16 SSM
I highly doubt we can put Brahmos either.What are the options for VL SSM these days other than Yakhont/Brahmos ?
Consider CAATSA , very unlikely we opt for Yakhont.
We can't/won't buy Chinese either.
Are we planning for LRASM ?
24 MR is camm-er albatros ng in 4 x 6 cell launcher, available if the front CIWS removed.24 MR
32 LR
16 SSM
24 is not 3x 8 mk41 but 4x6, small caliber albatros ng /camm er with gws 26/36. It fits into the front bay where ciws is optionally available.I highly doubt it. Too much deviation from original Arrowhead 140.
Say no to El-Ràsm. Say no to any Imperial Zionist systems.Are we planning for LRASM ?
There are Brahmos, or Brahmoonwe opt for Yakhont
That's only a preamble contract.Afaik the Iver Huitfeldt contract already been signed even Janes confirmed the contract in its article.
I am not against operating SSN, but right now we should focus getting SSK, we can start thinking about SSN in 2030+.Brazil got Nuclear powered Submarine from France right? With this kind of development, as Indonesia government itself very concerned about this issue and carefully studying the impact of Australia's power projection capability it would be sooner than later Indonesia would trying to get on their hand such capability too. This is a big issue for every countries in the region, not only about China threat, for every knife they can pointed at China is surely can be pointed at us or everyone else too.
Yeah, and I don't think the ship will be built in parallel.69 months is for two ships.
So 1 ship = ~35 months before moving to the 2nd hull.
Exactly.Yeah, and I don't think the ship will be built in parallel.
LPD and PKR at the same time is still possible in the past.Exactly.
We don't build ship this size in parallel, just look at the LPD and Hospital ship PAL build.