Aerospace & DefenseFrance, Germany and Spain strike deal over joint combat jet

Vergennes

Experienced member
Moderator
Professional
France Moderator
Messages
1,522
Reactions
5,978
Nation of residence
France
Nation of origin
France
France, Germany and Spain said on Monday they had reached a deal over the next steps of the development of a new fighter jet, Europe's largest defence project at an estimated cost of more than 100 billion euros ($121.4 billion).

France in particular has billed the combat jet project -- which includes a next-generation manned and unmanned aircraft -- as crucial for Europe to strengthen its defence autonomy and face competition from China, Russia and the United States.

The next development phase for the Future Combat Air System (FCAS) is expected to cost 3.5 billion euros ($4.25 billion), to be shared equally by the three countries.

"France, Germany and Spain are building one of the most important tools for their sovereignty and that of Europe in the 21st century," French Armed Forces Minister Florence Parly tweeted.


France's Dassault Aviation (AVMD.PA), Airbus (AIR.PA) and Indra (IDR.MC) - the latter two representing Germany and Spain respectively - are involved in the scheme to start replacing French Rafale and German and Spanish Eurofighters from 2040.

The sum will cover finalisation of the designs of both the combat jet and drone by 2024 and the building of demonstrators for both, a French defence ministry source said.

France and Germany had originally set the end of April for a deal, but a dispute over how to share intellectual property rights held up negotiations.

Under the terms of the agreement, the fighter jet will not have a black box to help preserve sensitive commercial know-how, the French defence source said.

However, even with a deal between the governments and aerospace companies, time is short for Berlin to secure the approval of Germany's powerful parliamentary budget committee ahead of September's federal election.

Approval is needed before funds can be spent and the process can take months.

Previously, a source with knowledge of the issue told Reuters the German defence ministry must refer the budget proposal to the finance ministry by May 19.

 

KKF 2.0

Well-known member
Messages
354
Reactions
825
Nation of residence
Turkey
Nation of origin
Turkey
For the last couple months the conservative German defense ministry put continuously pressure on the Spanish and French delegations in order to save the project. It is very likely that the next government in Germany will be led by the Green Party which is extremely sceptical of this project. They argue that this program will turn into a second F35 fiasco resulting in an unbearable rising of costs.
 

Follow us on social media

Top Bottom