Just thinking out loud: If the purchase of EF for the air force is finalized, can we become an industrial participant of this aircraft by undertaking the development cost of the STOBAR variant of EF, which has been prepared for several tenders before but has not received an order and therefore has not yet emerged, but the project was ready to start?

(The following excerpt is a worth reading post with concentrated information on the development of Navalize Typhoon in past.)


Not possible without other partners I think. UK and Italy use F35B, so only spain could be a canditate but they don't have a full carrier, F35B is more suitable for them because they have harriers on their LHD. I think it's inevitable. It would be an interesting development if we partnered for 2 carries and naval eurofighter though, but I don't think other partners would approve that anyways
 

dBSPL

Experienced member
Think Tank Analyst
DefenceHub Ambassador
Messages
2,281
Reactions
96 11,720
Nation of residence
Turkey
Nation of origin
Turkey
Not possible without other partners I think. UK and Italy use F35B, so only spain could be a canditate but they don't have a full carrier, F35B is more suitable for them because they have harriers on their LHD. I think it's inevitable. It would be an interesting development if we partnered for 2 carries and naval eurofighter though, but I don't think other partners would approve that anyways

If I were to give my opinion, if a country puts its money and bears the cost and risk of a variant and capacity expansion of a platform on which they are already making money for the partner countries in question, it is not pragmatic to be against it, and it would only be the product of political stupidity. I have hope that with the second Trump term, the EU region will face some harsh realities and this political stupidity will be left behind a little, including Germany, but of course this is my personal opinion. Because of that, I'm more interested in what would be a real alternative to the F35B if we don't have access to it, rather than other questions.

My Q; What if Turkish naval forces does financing the development of actual size fighter aircraft that will meet the needs of the naval combatant air forces exactly, over the the project that its model is ready, the feasibility has been done, but no client has been found before.

There is no doubt that the consortium countries are not interested in this variant. Countries in the EF consortium, including Spain, are not expected to engage in this type of development when they already have access to the F35B. As stated in the part I have already quoted, this 'project' has remained as a plan B. Apart from that, it may have been offered to India and Brazil, i dunno, it is necessary to scan the sources.. What we know that the engineering side of the project was largely ready and a number of institutions in the UK have put a lot of thought into it. This is the part I attach importance to, the engineering solutions of what to do and how to do it have already been worked on more than once.

But with an important nuance, Not, for example, that the Arab emirates fund Lockheed's F-16 variant development in the US, but whether there can be variant development that includes Turkish aerospace industry participation. The experience and cooperation to be gained here could pave the way for the development of a navalized jet within the domestic fifth generation jet development program in the future. This accumulation can also be achieved through the Hürjet Naval, but on the one hand, a platform that can meet the needs of naval combat aviation at the 'minimum level' may emerge, while on the other hand, there may be the opportunity to acquire a full combat jet.

This could be a strategic direction in terms of opening up access to a STOBAR jet that will meet your needs exactly, even if the sole user remains the Turkish naval forces. Like I said I'm just thinking out loud, this way we may have access to a fighter aircraft with an extra corrosion-resistant fuselage, flight avionics that provide more precise landing and take-off, reinforced landing gear, the ability to land on unprepared and short runways, and certified with all naval warfare munitions. Again, my personal opinion is that if we had such an aircraft, I would not equate the potential acquisition amount to MUGEM's typical air task force. Btw, I apologize to the forum if I took the current topic out of context, I like to chatter sometimes...
 

Fairon

Well-known member
Messages
407
Reactions
6 1,004
Nation of residence
Turkey
Nation of origin
Turkey
I think if we go for the naval aircraft development route for the MUGEM, we should make it a joint project between Air Force and Navy.(Not F35 but more like Rafale)

Air Force probably will need a single engine multirole aircraft that accompanies Kaan in the future(because of the possible KAAN cost) and Navy will need an aircraft for the MUGEM. This way the cost will be much more justifiable.
 

dBSPL

Experienced member
Think Tank Analyst
DefenceHub Ambassador
Messages
2,281
Reactions
96 11,720
Nation of residence
Turkey
Nation of origin
Turkey
I think if we go for the naval aircraft development route for the MUGEM, we should make it a joint project between Air Force and Navy.(Not F35 but more like Rafale)

Air Force probably will need a single engine multirole aircraft that accompanies Kaan in the future(because of the possible KAAN cost) and Navy will need an aircraft for the MUGEM. This way the cost will be much more justifiable.
I am not as hopeful as some friends about this single-engine KAAN. The reason for this is the possible platforms of the TAF combat fleets that are slowly becoming apparent for next 20 years. Especially when compared to the payload capacity and typical operational radius, a scale is seen to have formed. Even if the Navy were to make room for it, the design and development of such a new airframe would likely take until the 2040s to deliver it to the Navy, considering current ongoing programs.

GcSHKHqX0AAkvib

(illustration tr_tech X.com)

With twin +6000lbf engine configuration, both KE and ANKA variants will continue their expansion. On top of all this, although there are various debates among defense enthusiasts, one way or another the LCA variant for the Hürjet is now almost certain. In other words, there will be a payload capacity ranging from 1 tons to possibly 4 tons on 5 platforms with a similar flight envelope to main combat jets. Except for long range strike drones without afterburners, in case of longer range and a payload requirement of more than 5 tons, the main combat platform KAAN will be responsible, meanwhile I think the capacity will be much less in full stealth mode.

The aircraft that will be navalized will weigh more at least half ton, maybe more. Due to the nature of the STOBAR operation, it is also very difficult to take off these aircraft from the carrier with its full payload capacity. While there will be so many options below of scale, I believe that if a navalized variant is to emerge through the next gen fighter KAAN program, the fastest way to do this is to work on navalizing the existing airframe, perhaps with a foldable wing configuration like the F35C, without compromising the aircraft's current targeted power output and capacity as much as possible.

I think the most important issue here will be that we can produce the engine domestically. Thus, both production and maintenance-operation expenses will remain domestically to the maximum extent.
 

UkroTurk

Experienced member
Land Warfare Specialist
Professional
Messages
2,675
Reactions
54 4,775
Nation of residence
Turkey
Nation of origin
Turkey
Just thinking out loud: If the purchase of EF for the air force is finalized, can we become an industrial participant of this aircraft by undertaking the development cost of the STOBAR variant of EF, which has been prepared for several tenders before but has not received an order and therefore has not yet emerged, but the project was ready to start?

(The following excerpt is a worth reading post with concentrated information on the development of Navalize Typhoon in past.)


I am raising the stake and

CDA_NFA.jpg

 

Baklava Consumer

Active member
Messages
81
Reactions
3 210
Nation of residence
Turkey
Nation of origin
Turkey
UK Ministry of Defense was considering "disposing of" one of the two Queen Elizabeth-class aircraft carriers.


Gov should consider this, you can get one of these for dirt cheap and convert it into CATOBAR for a future naval Kaan, it can accommodate 3 electromagnetic catapults if you remove the ramp. Can save a lot of money/time and make Turkish navy a true blue water navy.
 

Anmdt

Experienced member
Naval Specialist
Professional
Messages
5,490
Solutions
2
Reactions
118 24,792
Nation of residence
Turkey
Nation of origin
Turkey
UK Ministry of Defense was considering "disposing of" one of the two Queen Elizabeth-class aircraft carriers.


Gov should consider this, you can get one of these for dirt cheap and convert it into CATOBAR for a future naval Kaan, it can accommodate 3 electromagnetic catapults if you remove the ramp. Can save a lot of money/time and make Turkish navy a true blue water navy.
Man, please follow and post credible sources. Not someone's comment on an article that wasn't even read thoroughly.

However, they believed it would be unlikely that ministers would get rid of one of the carriers because they would have to pull out of a commitment to be permanently available for Nato duties. “I don’t think we would downgrade our commitment at a time when the US are signalling moving away,” the source said, adding that a Trump’s victory in the American presidential election made a reduction in Britain’s Nato commitments unlikely.

Original source;

Get rid of these wannabe experts for God's sake.
 

dBSPL

Experienced member
Think Tank Analyst
DefenceHub Ambassador
Messages
2,281
Reactions
96 11,720
Nation of residence
Turkey
Nation of origin
Turkey
IMO, HMS Ocean was a bargain buy opportunity, Brazil's need was very urgent or due to technical difficulties, I don't know, it didn't materialize. Brazil aquired the ship for a very symbolic sale price and with a really fast retrofit plan. Other than that, neither a second hand frigate procurement nor an attempt on HMS PoW would not only be an extra headache and cost, but would also have the effect of reducing the competitiveness of the Turkish shipbuilding industry. Despite that, some of the Turkish defense industry's social media circles periodically try to create speculation about these.
 