Bangladesh Navy Frigate Program

Isa Khan

Experienced member
Moderator
Messages
7,240
Reactions
53 10,301
Nation of residence
Bangladesh
Nation of origin
Bangladesh
1633099306932.png

1633099327196.png


China unveiled its first type of made-for-export ship-borne vertical launch system at the ongoing Airshow China 2021. The VLS’ quad-pack launch cells can load up to four missiles instead of just one, which is one of its most important features.

The HT-1E universal vertical launch system, which is suitable for all types of seagoing warships, is the first of its kind to be licensed for export in China, according to China Aerospace Science and Industry Corporation (CASIC).

HT-1E VLS​

Unlike prior launch systems that were specialized to specific types of missiles and were complicated and took up extra space, the HT-1E is universal, allowing it to carry a greater number of missiles of various varieties, according to CASIC.It can significantly boost a warship’s multirole capabilities in carrying out multidirectional, large area and saturation attack and defense missions, CASIC said.

The HT-1E was loaded with missiles including the CM-103 long-range supersonic cruise missile, HHQ-9E long-range air defense missile, CM-802B subsonic missile, and FM-3000N air defense missile at the CASIC exhibition hall at the air show. While bigger missiles such as the CM-103 and HHQ-9E require their own vertical launch cell, the same cell may hold up to four smaller missiles such as the FM-3000N.

According to CASIC, the HT-1E is compatible to both cold- and hot-launched missiles.

 

Isa Khan

Experienced member
Moderator
Messages
7,240
Reactions
53 10,301
Nation of residence
Bangladesh
Nation of origin
Bangladesh
Finally some progress!! CDDL signed a contract with IWM and Royal Haskoning for consultancy service to prepare draft DPP and feasibility study to upgrade CDDL by constructing second dry dock with associated shipbuilding infrastructure on 14th October, 2021. Senior defense secretary Abu Hena Mostafa Kamal also visited CDDL on 16th October, 2021. The dockyard has approximately 10 acres of empty lands for the construction of the second dry dock. (3rd picture)

cont1.jpg

cont2.jpg

snrsecvisit3.jpg
 

Gary

Experienced member
Messages
8,361
Reactions
22 12,853
Nation of residence
Indonesia
Nation of origin
Indonesia
Finally some progress!! CDDL signed a contract with IWM and Royal Haskoning for consultancy service to prepare draft DPP and feasibility study to upgrade CDDL by constructing second dry dock with associated shipbuilding infrastructure on 14th October, 2021. Senior defense secretary Abu Hena Mostafa Kamal also visited CDDL on 16th October, 2021. The dockyard has approximately 10 acres of empty lands for the construction of the second dry dock. (3rd picture)

cont1.jpg

cont2.jpg

snrsecvisit3.jpg
So do we have a winner already for BN frigate tender ?
 

Isa Khan

Experienced member
Moderator
Messages
7,240
Reactions
53 10,301
Nation of residence
Bangladesh
Nation of origin
Bangladesh
So do we have a winner already for BN frigate tender ?

I don't think so. After BN messed up the plan we all thought first two frigates will be built by foreign shipyard but so far it looks like CDDL is sticking to it's original plan to build all six frigates locally. After building the second dock and developing the design house i expect they will proceed to construction of those ships.
 

Gary

Experienced member
Messages
8,361
Reactions
22 12,853
Nation of residence
Indonesia
Nation of origin
Indonesia
I don't think so. After BN messed up the plan we all thought first two frigates will be built by foreign shipyard but so far it looks like CDDL is sticking to it's original plan to build all six frigates locally. After building the second dock and developing the design house i expect they will proceed to construction of those ships.
Any timeline for first hull launch ?
 

Isa Khan

Experienced member
Moderator
Messages
7,240
Reactions
53 10,301
Nation of residence
Bangladesh
Nation of origin
Bangladesh
This could be a potential candidate if it comes with Hisar-O/G-40/CAMM ER.


Length (Loa):141.40 m
Beam:18.50 m
Draft:4.60 m
Displacement:5500 t
Max Speed:27+ kts
Endurance:90 Days
Range:5000 NM
Hull:Steel
Superstructure:Steel
Crew:188 People
Classification:Turkish Lloyd / IACS

WEAPONS

  • 1 x 76 mm. Leonardo Super Rapid Gun
  • 2 x 35mm. Close in Weapon System (CIWS)
  • 2 x 12.7mm. Stabilized Automatic Machine Gun
  • 4 x 8 Surface to Air Missiles
  • 2 x 8 Surface to Surface Missiles
  • 2 x Torpedo Launching System
1642598254326.png
 

Anmdt

Experienced member
Naval Specialist
Professional
Messages
5,540
Solutions
2
Reactions
119 25,155
Nation of residence
Turkey
Nation of origin
Turkey
This could be a potential candidate if it comes with Hisar-O/G-40/CAMM ER.


Length (Loa):141.40 m
Beam:18.50 m
Draft:4.60 m
Displacement:5500 t
Max Speed:27+ kts
Endurance:90 Days
Range:5000 NM
Hull:Steel
Superstructure:Steel
Crew:188 People
Classification:Turkish Lloyd / IACS

WEAPONS

  • 1 x 76 mm. Leonardo Super Rapid Gun
  • 2 x 35mm. Close in Weapon System (CIWS)
  • 2 x 12.7mm. Stabilized Automatic Machine Gun
  • 4 x 8 Surface to Air Missiles
  • 2 x 8 Surface to Surface Missiles
  • 2 x Torpedo Launching System
View attachment 38751
Just a note, since the shipyard has forgot to mention;
The range can be increased via reconfigurable spaces. The initial design is made for a customer who is not interested in long-range autonomy. The range can be increased up to 9/10,000 NM.
 

F-6 enthusiast

Well-known member
Messages
417
Reactions
1 595
Nation of residence
United Kingdom
Nation of origin
Bangladesh

Follow us on social media

Top Bottom