urban mine
Contributor
Prime Minister Mark Carney aboard the KSS-III Batch-II.
Last edited:
Latest Thread
HD Hyundai Heavy Industries announced on Thursday, the 30th, that it has signed a contract with the Defense Acquisition Program Administration (DAPA) for a system development project to upgrade the performance of three Jangbogo-II (Type 214) submarines, valued at 468.9 billion KRW.![]()
View attachment 77972
This performance improvement project covers three of the nine Jangbogo-II submarines that have been in service for more than 10 years. Key equipment, including the Combat Management System, Towed Array Sonar, Mine Avoidance Sonar, and Buoy Antenna, will be replaced with the latest models. HD Hyundai Heavy Industries plans to complete the performance upgrade by 2033, in cooperation with LIG Nex1, which previously carried out the upgrade of the Jangbogo-I (Type 209) submarines.
View attachment 80026
Data released by the ROKN on the status of toilets, shower rooms, and beds on each submarine.
The living conditions are really poor, aren't they?
You're absolutely right. The reality is that, at this point, submarines can only be equipped with this level of amenities.Its pretty much standard thing baked in with all SSK subs. Just scaling up crew comfort with tonnage etc.
Beyond a point it becomes impractical to scale past 4000 tons etc to get to say SSN sizes (and crew comfort there) given stealth considerations SSKs want to preserve as advantage as far as possible. Crew comfort is thus constrained to within this tonnage range (1000 - 4000 tons)