Latest Thread
Yes, this is an UCAV, not a manned oneAn early induction TF6000 engine will just do fine before a mature engine is available. I will give it 3 years tops.
With that size, seems like they can fit 2 AI-322f side by side
I told you that a twin-engine version of the Kızılelma's is planned.Some specs for Kizilelma UCAV;
View attachment 47273
- Length; 14.7 meters
- Wingspan; 10 meters
- Height; 3.3 meters
- Cruise/Max Speed: 0.6/0.9 Mach
- Operational/Max Altitude; 35,000/45,000 feet
- Operational range: 500nm
- Useful load: 1,500kg
- Max Takeoff weight; 6,000kg
- Propulsion;
- 1xAI-25TLT
- 1xAI-322F
- 2xAI-322F (Confirming twin engine supersonic variant on the way)
- STOL and Carrier Landing Capability
Feels good to say "I told you so" doesn't it?I told you that a twin-engine version of the Kızılelma's is planned.
Haluk Bayraktar: KIZILELMA's flight time is about 5 to 6 hours with full load [ about 2 tons]... the prototype that appears here is the flying prototype, the real airplane, so… there are two more prototypes like this [being made].
View attachment 47288
Source:
We probably canCould we get surprised with a test flight in a few months?
Is that 4x miniature bomb Aselsan developed. Damn nice.AKINCI centreline station with Aselsan developed small diameter bombs. Going to be a UCAV with the most extensive list of weapons integrated for sure!
View attachment 47274
Haluk Bayraktar: KIZILELMA's flight time is about 5 to 6 hours with full load, about 2 tons... the prototype that appears here is the flying prototype, the real airplane, so… there are two more prototypes like this [being made].
View attachment 47288
Source:
Yes. Minbos should have been in serial production process since 2021Is that 4x miniature bomb Aselsan developed. Damn nice.
1. KE is being shown at the Tenofest Karadeniz