Keel laying ceremony has been held in RMK Marine shipyard, with attendance of officials from Ukranian Navy and STM.
Minister of defense has also made some remarks on the weapon systems, indicating that VL MICA has not been ordered yet, and for anti-ship missiles both Atmaca and Harpoon is being considered.
The CMS and IPMS will be supplied by Turkey (Havelsan, Yaltes), The radar seems to be Smart-s and to be supplied by Aselsan, CIWS system on the image seems to be Gokdeniz but also resembles Goalkeeper or Millenium gun with an additional tracking radar module.
As expected that can be read between the lines, Ukraine plans to develop their own systems for the future ships, either starting from the 3rd or the 5th.
The launching date is set to be 2022, sea trials aimed for 2023 and the ship will be commissioned in 2024 (Q1-Q2) .As of now there is no Ukranian personnel being involved in the production or design, but they could be involved in the second ship for ToT. For now it is not clear whether the second ship will be built in Turkey or i Ukraine, but both will be equipped with systems purchased by Ukraine in Ukraine, by Turkish personnel. There are also rumors that a private shipyard may be established in Ukraine by acquiring one of the shipyards in there for construction of the Ada Class or through a JV of Turkish/Ukranian companies.