i want 6 of those, please and thank you.This path leads to an aircraft carrier with a displacement of +50K.
- Naval Hurjet (even Naval MMU)
- KE-B/C
- Low-observable flying wing UAV
Latest Thread
i want 6 of those, please and thank you.This path leads to an aircraft carrier with a displacement of +50K.
- Naval Hurjet (even Naval MMU)
- KE-B/C
- Low-observable flying wing UAV
6 OF WHAT ?i want 6 of those, please and thank you.
i want 6 of those, please and thank you.
who is going to pay for The 6 carriers?
carriers are super expensive to build and operate and have little value in Med., Black Sea and Red Sea
Carrying even 1 AC task force will be a serious cost for the current scale of the country's economy. Not to mention construction costs. One should not think of aircraft carriers in alone, they are like floating bases operating with a whole task force ships.i want 6 of those, please and thank you.
@dBSPL if turkey want to project power with the combination of some low tonnage ucav carriers and a supportive task force to the possible future low and medium intensity conflict around the african cost or in middle east, no doubt that's the best way to go for. ( as you described it )Carrying even 1 AC task force will be a serious cost for the current scale of the country's economy. Not to mention construction costs. One should not think of aircraft carriers in alone, they are like floating bases operating with a whole task force ships.
IMHO, we will see 5-6 carriers by the 2040s. However, these ships will be much lower tonnage (under 10K displacement) drone motherships that will be for increase the impact area of unmanned systems* rather than an AC in the conventional sense.
*tactical air, underwater and surface unmanned systems
not tb2
Nope. As I have said previously, they referred to the aircraft as fictional and that it "could be on the drawing board". There were no signs of any jet powered UAV on the production or assembly facilities. I didn't come across a dedicated hangar either. But I do sometimes wonder what this place is for... Could be dedicated to helicopters (that general area is where heli flight testing takes place). Or it genuinely could be a brand new production plant for something quite different.That thing must be huge, you can't just assemble it in corner of the facility. It should have a dedicated hall for itself and assembly line, with huge hangar doors. @MADDOG, have you seen such a place while strolling around?
Now i am more intrigued about that HALE project once mentioned to be under development by Tubitak - TAI and then disappeared into thin air.
Is this the UAV that will refuel the KIZILELMA-C in the air?
I really wish it is a 6 ton aircraft and not 6 ton MTOW aircraft.Greecoman!
I see smoke!
TISU: Mach 0.7 speed, February first flight.
Is the source trustworthy?Greecoman!
I see smoke!
TISU: Mach 0.7 speed, February first flight.
I don't know but I have been seing his name for a while now. He has around 50k followers.Is the source trustworthy?
He is nothing but a propaganda machine with 0 knowledge.