What I find baffling is the speed of the drone project where Erdogan says production 2023, has there been any Turkish projects that has been delayed before?(knock on wood it won't happen to this project). not as negative criticism but the timeframe is just insanely fast and I cannot be the only one here that thinks that.
We had the Euros fly the Bae Taranis and neuron and they have never fired weapons or dropped a bomb and still to this day have not set production dates same with the X-47B that got cancelled. The Okhotnik-b had a test fight in august 2019 and a series of more flights and set production for 2023. Now this drone looked like it was to use Ukrainian engines according to Wikipedia but a user told me the TF-6000 engines will be used in which it will have flight before the end of 2022 but a set production for 2023. Does anyone have atleast a little concern with that fast timeframe? If not, Turkey will set a lot of world records on this project. Just want to share this opinion if it has not been brought up before.