Because, most probably TEI inspired from the only similar engine which they produced. They already know very well and experienced about F110.The feather on the TEI TF10000 reminds me on the GE F110
Because, most probably TEI inspired from the only similar engine which they produced. They already know very well and experienced about F110.The feather on the TEI TF10000 reminds me on the GE F110
Even if the tender is awarded to the RR/Kale duo, the TEİ/TRMotor duo must start their work as if they had won the tender themselves. How do you know that RR, who won the tender, won't cause any problems?It seems TEI/TrMotor is charged to develop 35000lb turbofan engine.
It seems that IP rights will be owned by TRMotor. TEI will produce majority. I expect that Kale will be involved to produce some parts. So everyone will be happy.It seems TEI/TrMotor is charged to develop 35000lb turbofan engine. From these statements, we can read that TEI/Trmotor group is selected in the background by state. If we want to challenge the world's giants technologically, we need to develop this technology ourselves and I have full confidence that we will succeed.
Gazamız Mübarek olsun!
TF6000 is a little oversize for KE I guess. Baykar's plan A is likely to be sticking to initial engine plans with Ukraine and TF6000 can be plan B.What drew my attention was Mr. Akşit answer to the KE question... To me, it seemed he almost didn't want to talk about KE and TEI6000 in the same sentence.
Yes and I think the only logical conclusion after this is that TF6000 was developed specifically for that mysterious unmanned bomber which TAI apparently has already built, which makes that project even more mysterious. I wonder how many engines will that thing have, I think it might have four or maybe six.What drew my attention was Mr. Akşit answer to the KE question... To me, it seemed he almost didn't want to talk about KE and TEI6000 in the same sentence.
1Yes and I think the only logical conclusion after this is that TF6000 was developed specifically for that mysterious unmanned bomber which TAI apparently has already built, which makes that project even more mysterious. I wonder how many engines will that thing have, I think it might have four or maybe six.
No one will give you IP rights of a 5th generation turbofan engine. Let us be realistic. You can’t really expect RR to relinquish a technology that took them decades to perfect, even if we are paying mega bucks for it.screw RR, we have to face it they don't want to give IP rights .
Aşı pişiren yağ olur, gelinin yüzü ağ olur
Fortunately this also seems to be the approach by the SSB.I hope the RR/Kale option is put on the table soon and finalised. We shouldn’t put all our eggs in TEI’s basket!
I hope the RR/Kale option is put on the table soon and finalised. We shouldn’t put all our eggs in TEI’s basket!
This is very good question!Do we have the funds for two baskets?
It is not up to us to fund the development of the RR engine. TAEC will fund it and make the engine and TAI will buy it. They will make their money by selling it to TAI.Do we have the funds for two baskets?