Very interesting technology Ted. Will this 165 meter Shiflift drydock be able to lift both the Protecteur JSS and CSC River class; will it be built on the Halifax side of ISL and how long will the build process be from Bardex? It seems to be about 25-30 feet shorter for the JSS so, maybe not for that class.