TR HÜRJET-Advanced Jet Trainer/ Light attack aircraft

Zafer

Experienced member
Messages
4,641
Reactions
7 7,326
Nation of residence
Turkey
Nation of origin
Turkey
TF-10000 is too small for Hürjet, F404 gives nearly 40% more dry and 80% more wet thrust.
Looking at how rapidly Hürjet is maturing a twin engine version will probably mature just as fast. Kaan is twin engine, pilots should be trained on a twin engine aircraft.
 

Sanchez

Experienced member
Moderator
Think Tank Analyst
DefenceHub Diplomat
Messages
2,069
Reactions
69 9,328
Nation of residence
Turkey
Nation of origin
Turkey
Looking at how rapidly Hürjet is maturing a twin engine version will probably mature just as fast. Kaan is twin engine, pilots should be trained on a twin engine aircraft.
If the B-0 delivery date to AF is being updated from 2025 to 2027, can we safely say it's maturing at the indicated rate?
 

what

Experienced member
Moderator
Messages
2,119
Reactions
10 6,268
Nation of residence
Germany
Nation of origin
Turkey
Kotils timelines were always overly optimistic imo. That was his management style.
But looks like others have to now clean up the mess.
 

Merzifonlu

Contributor
Think Tank Analyst
DefenceHub Diplomat
Messages
704
Reactions
24 2,091
Nation of residence
Turkey
Nation of origin
Turkey
It is probably because of supply chain issues rather than the maturing.
+1

There were probably two developments. 1- Foreign components could not be supplied for mass production. 2- Localization of foreign components used in the prototype was delayed due to budget cuts. Local components will be awaited for mass production.
 

Sanchez

Experienced member
Moderator
Think Tank Analyst
DefenceHub Diplomat
Messages
2,069
Reactions
69 9,328
Nation of residence
Turkey
Nation of origin
Turkey
Hürjet program update:

"Delivery of 4 Block-0 aircraft in 2027 and 12 Block-1 aircraft with the same configuration in 2028-2029"

Original announced calendar was 4 Block-0 aircraft for air force testing in by the end of 2025 and 12 Block-1s until end of 2028. 2 year delay, which will inevitably delay the type's acceptance by the air force.

Tolga Özbek instead claims first delivery date is not 2027 but 2026.

"Following today's news that the HÜRJET will be delivered in 2027, I spoke to TAI sources. Although the SSB reports indicated that the delivery date was 2027, this date was brought forward to 2026. TAI attaches great importance to this date. Because 2026 is very important for the Turkish Air Force, as well as for exports.
In our interview with General Manager Mehmet Demiroğlu at Farnborough, he gave the date 2026."

 