https://turdef.com/article/aselsan-tests-sarp-200-12-7d-with-atom-40-airburst-grenades
New Sarp dual with Atom 40mm and new drone tracking Sofware with internal loading capability
Would still be good and with aselsan production increasing every year it could even get bigger. Only thing that matters now is the missile production but that is also dependent on them
''Starting from 2026 Aselsan will deliver 100 Systems/Components of celik kubbe annually.''
No idea if they mean complete systems or just the single vehicles. A single hisar battery consist of 8 vehicles.
1. Kizilelma with one TF1000/TF6000 engine
2. Kizilelma with one Baykars engin(20000Lbf)
3. Kizilelma with twin engines
4. Naval Kizilelma
TAI Tisu=Anka 3/(4)
Electronic Warfare Uav-> Aselsan ew pods/Asoj 234U
But i would be careful with believing everything he said. My boy literally said...
Tolun F(fragmentation Warhead) firing test from Akinci.
two Tolun F on the outer pylons and two normal on the central pylon.
Maybe it will also get IIR variant in the future
i know i just wanted to say that at least 6 are under contract to be build, 2 are under construction with dearsan and 4 are to be decided and an option for 2 more.