With a Tranche 4 being prepped and with delivery schedule being a priority, maybe we will see a first order for 20 aircraft with Mk0s, and an option for 20 with Mk2s, because as also mentioned per Mevlütoğlu today, Mk2 IOC is aimed for 2030:
"With Initial Operating Capability (IOC) expected by 2030, the ECRS Mk2 radar will significantly enhance the RAF’s frontline Typhoon squadrons, solidifying their position as a dominant air superiority platform."
Inside Leonardo’s Edinburgh facility, engineers are building what’s been called the most advanced combat radar ever developed in Europe. The ECRS Mk2 will transform the RAF Typhoon’s ability to detect, jam, and fight in contested airspace. George Allison went behind the scenes to take a closer look.
ukdefencejournal.org.uk