Indonesia Indonesian Navy, Tentara Nasional Indonesia-Angkatan Laut (TNI-AL)

this is crunch

Contributor
Messages
657
Reactions
4 633
Nation of residence
Indonesia
Nation of origin
Indonesia
I find it unique, KRI Golok moored in pier in overlapping position due to it's trimaran shaped hull
Screenshot_20230421-040553_YouTube.png

sc from youtube
 

Parry Brima

Contributor
Messages
982
Reactions
1 1,057
Nation of residence
Indonesia
Nation of origin
Indonesia
thoughts ?


6 FREMM + 2 Maestrale = $4.6 bil.
3 FREMM = $2.2 bil.

As long as all 3 will indeed be built at Fincantieri, then I have no problem with that. Go for it.

MoD probably thinks to get approval for $2.2 bil is gonna be much easier than $4.6 bil. Especially it's now less than 10 months before the election.
 

Umigami

Experienced member
Moderator
Indonesia Moderator
Messages
6,450
Reactions
5 5,264
Nation of residence
Indonesia
Nation of origin
Indonesia

Lordimperator

Experienced member
Moderator
Indonesia Correspondent
Indonesia Moderator
Messages
5,024
Reactions
3 2,870
Nation of residence
Indonesia
Nation of origin
Indonesia
I don't really trust SoKor naval products.
Well, i think the same, but this is KSS iii, i dont think its bad idea to miss this chance. Having arsenal with 2nd strike capability.
 

NEKO

Experienced member
Indonesia Correspondent
Messages
3,185
Reactions
4 2,810
Nation of residence
Indonesia
Nation of origin
Indonesia
Oh the, the new shiplift system design is lined up with the hangar? Nice, simpler.
NLC 6000 ton, we can use it to lift AH140/ frigat merah putih and build it inside the hangar (kalau muat) just like the brits, they build their Arrowhead frigate indoor.

I don't really trust SoKor naval products.
I am okay with it.
 

R4duga

Experienced member
Messages
1,670
Reactions
2 2,367
Nation of residence
Indonesia
Nation of origin
Indonesia
Oh the, the new shiplift system design is lined up with the hangar? Nice, simpler.
NLC 6000 ton, we can use it to lift AH140/ frigat merah putih and build it inside the hangar (kalau muat) just like the brits, they build their Arrowhead frigate indoor.


I am okay with it.
with 100m long floating dock platform ?
 

Twentix

Active member
Messages
45
Reactions
35
Nation of residence
Indonesia
Nation of origin
Indonesia
Real source from their site : https://drive.google.com/file/d/17yMUCaZNjrpUI6WZUcKMg6K17w5xSiq6/view

The contender:
Peserta Tender :

RA In Ho Co.Ltd – Korea
PEARLSON SHIPLIFT CORPORATION – USA
SYNCROLIFT – Norwegia
TPK Co. Ltd. – Korea
PT Pindad – Indonesia (u can search the news about this why Pindad join the procurement, around sept-oct 2022)
 

Qimpetmleteque

Active member
Messages
69
Reactions
1 42
Nation of residence
Indonesia
Nation of origin
Indonesia

I think this is an excellent business process from a proud SOE that is famous for products labeled 'Karya Anak Bangsa':

1. Equity capital approved in 2021.

2. It took 2 years to implement the procurement, 2023.

3. If this design tender process goes well, then to submit equity capital to build a shiplift in 2024.

4. If equity capital will be approved in 2025, it will take another 2 years to implement the procurement, in 2027.

5. If the construction tender process goes well, the shiplift construction will take 2 years, will be completed at least in 2029.

6. If the construction process goes well, then to submit a submarine procurement budget in 2030.

7. Errrr...... Good luck!!!


CMIIW
 

Follow us on social media

Top Bottom