So they don’t want to buy from Otokar and FNSS because they are waiting for BMC ? Correct ?
So they don’t want to buy from Otokar and FNSS because they are waiting for BMC ? Correct ?
So they don’t want to buy from Otokar and FNSS because they are waiting for BMC ? Correct ?
Bro by default, a deadline will apply to any kind of procurement or performance test. A universal fact. So it’s there alright.Honestly a deadline should be put in place
Anybody who fails to meet it should f off.
Altug can be sold to other countries its not like bmc is missing out on anything.
If you read that part as well, they put local engine to that one as well!! The ones already produced by FNSS and Otokar needs to be redesigned !! This is also an act to give tender to BMC!!Bro by default, a deadline will apply to any kind of procurement or performance test. A universal fact. So it’s there alright.
What they do here though is they re-do the tests for wheeled models due to “certain reasons” (paraphrasing Mr. Sunnetci’s tweet)
the tracked models… is a very different story and kind of destined to share a similar fate with Altay I’m afraid
Absolutely . I read it all.If you read that part as well, they put local engine to that one as well!! The ones already produced by FNSS and Otokar needs to be redesigned !! This is also an act to give tender to BMC!!
We can get engines for this level, why we are not using engines from abroad for limited number and get rest with local engines??Timeline likely extended because of the requirements that engine would be nationally made
Bro by default, a deadline will apply to any kind of procurement or performance test. A universal fact. So it’s there alright.
What they do here though is they re-do the tests for wheeled models due to “certain reasons” (paraphrasing Mr. Sunnetci’s tweet)
the tracked models… is a very different story and kind of destined to share a similar fate with Altay I’m afraid
Timeline likely extended because of the requirements that engine would be nationally made
Did Altug fail in the mine/ied tests?If this was the reason they would have given it.
Saying „reasons“ only points to one reason the same reason they delayed the Altay tender for 2 years.
we all know the reason why the decided after the mine/ied tests to redo it.
Altug crumbled like a piece of paper and now they need a way to give BMC time to fix the vehicle or it will be disqualified in the first round already.
A company that is bleeding money and personnel. A company which has never before designed a armored vehicle from the ground.
No wonder Altug has failed the tests.
Let’s see how long they will delay this tender to give BMC even a chance of competing just to choose Altug anyway even though it comes dead last.
Not to even speak about the fact that BMC has no production lines. Where are they gonna produce Altug in a mass production? Or are we gonna wait 18 months tm for that too once they force a rushed decision on the Land Forces to choose Altug?
If this was the reason they would have given it.
Saying „reasons“ only points to one reason the same reason they delayed the Altay tender for 2 years.
we all know the reason why the decided after the mine/ied tests to redo it.
Altug crumbled like a piece of paper and now they need a way to give BMC time to fix the vehicle or it will be disqualified in the first round already.
A company that is bleeding money and personnel. A company which has never before designed a armored vehicle from the ground.
No wonder Altug has failed the tests.
Let’s see how long they will delay this tender to give BMC even a chance of competing just to choose Altug anyway even though it comes dead last.
Not to even speak about the fact that BMC has no production lines. Where are they gonna produce Altug in a mass production? Or are we gonna wait 18 months tm for that too once they force a rushed decision on the Land Forces to choose Altug?
Complete and utter tosh, much like everything else you post to smear BMC - atleast have some credible sources then to come up with fabricated lies.
For those wondering, Altug actually passed the blast tests. Having another round of testing for all vehicles involved in the tender process has nothing to do with short comings of any particular vehicle.
Yeah looking from this side I think it does.Oh wow it does have a compact design.
I guess I got it confused with its huge ass turrent
Complete and utter politically inspired tosh, much like everything else you post to smear BMC - atleast have some credible sources then to come up with fabricated lies.
For those wondering, Altug actually passed the blast tests. Having another round of testing for all vehicles involved in the tender process has nothing to do with short comings of any particular vehicle.
That is your evidence? A GIF without any footage of the results? HAHAHAHAHA
My man your BMC is done for. It is already a dead man walking the elections will be its funeral. And in two years people like you will walk around and deny ever having defended this stain of a company.
It is bleeding personnel and money. It's new yandas owners know this and can't do anything other than downscale projects and let people walk. Its reputation is in the gutters. When was the last time BMC even exported something without it be bought by the government and gifted to "friendly" nations?
There is a reason Ethem Sancak sold his shares and then started shit talking your reis and his (former) best friend. Dude to this day is laughing his ass off.
If half the shit given to BMC was given to Otokar or even FNSS and they delivered as badly as them you would be shit talking here daily. But instead you try to defend a pathetic company and its preferred status by the government because it all leads back to the person you fanboy about every day.
Scratch that you talk shit about Otokar every day here because of pure political motivation. Don't make me laugh. We all know why you do it. Meanwhile BMC is using the same powerpacks and foreign subsystems in its vehicles, and then you come around and akshually the discussion. And no you aren't sly about the way you do it.
BMC can only dream of developing and producing vehicles in the same quality as Otokar or FNSS.
We will talk again after the election until then you can continue your charade.