Maybe something the german Delay ?
Latest Thread
Nope. It is related to the helicopter capture and transfer system.
Maybe something the german Delay ?
They did block MTU engines and STM & DzKK agreed to switch with MAN engines. Renk cross connect gears are, however, delivered or ordered with no further issues. This is strange, to my opinion the gearbox is much more crucial since it is custom made and would cause delays in the project since there is no alternative supplier.
According to President Erdoğan Germans are blocking machinery (probably related to propulsion) for Turkish frigates, turbines for the Akkuyu nuclear plant, and the Eurofighter deal.
Germans are also slowing down the Reis class submarine project.
To enrich this with this;I am totally on this page, likely TN thinks the same. They have had a great and indispensable input for 76mm project and i don't think they would be willing to allocate additional resources for a 127mm project. We should improve 76mm as far as possible to the SR level and equip it with multi-purpose smart munitions. From there on we may work on 127mm smart munitions for 127mm to be supplied from foreign partners.
76mm could be even meaningful for the multi-purpose frigates. Twin 76mm configuration would provide a better protection and higher fire of rate and easier integration. 76mm goes one deck level depth, 127 occupies 3 deck levels.
Let's just focus on 40mm and 76mm and make these as compact and responsive as possible, equipped with variety of smart munitions, and with optional non-penetrating variants.