What is the reason behind this refusal?
In proposed plans, so far only on MCMW vessel, you can see that the USV is seamlessly integrated on side-bays and has no GCS abruptly installed around the deck. And most likely the USV either has a dedicated console in CMC or integrated with Advent through Advent ROTA.
It is only Baykar that keeps refusing to integrate.
Last edited: