since they specifically utter "early tests" for 2026, I assume it won't be a fully built engine but some modular tests to validate their assumptions before committing to a prototype.
If you are talking about parts Q/C tests, that is an issue that they should be doing now. They have come to a stage where they are ready to build a prototype. In virtual world and in computer drawings they have an engine with each part to be produced already specified to the quality level they demand off of it.
Early test of an engine has to be a test on a complete engine.
Say they are aiming for the engine’s fan to rotate at 4000 to 5000rpm and LP spool to spin at 12000 to 15000rpm and HP spool to spin more than 20000rpm; they would first run it at very low rpm levels and check the performance and wear and tear on parts. Accordingly new parts replace sub par units. When the engine is responding within a given tolerance level then the so called first ignition is made. That is when the engine is pushed to its optimum available rpm. At least that is my understanding.
I can’t imagine any other way an early test can be done on an engine. The engine has to work as a whole to be tested. You can’t test individual parts of a turbofan if the engine is not working.
 

hugh

Contributor
Messages
471
Reactions
13 1,216
Nation of residence
Turkey
Nation of origin
Turkey
If you are talking about parts Q/C tests, that is an issue that they should be doing now. They have come to a stage where they are ready to build a prototype. In virtual world and in computer drawings they have an engine with each part to be produced already specified to the quality level they demand off of it.
Early test of an engine has to be a test on a complete engine.
Say they are aiming for the engine’s fan to rotate at 4000 to 5000rpm and LP spool to spin at 12000 to 15000rpm and HP spool to spin more than 20000rpm; they would first run it at very low rpm levels and check the performance and wear and tear on parts. Accordingly new parts replace sub par units. When the engine is responding within a given tolerance level then the so called first ignition is made. That is when the engine is pushed to its optimum available rpm. At least that is my understanding.
I can’t imagine any other way an early test can be done on an engine. The engine has to work as a whole to be tested. You can’t test individual parts of a turbofan if the engine is not working.
i am speaking of component level testing of different subassemblies. there could be specialized testing equipment and rigs to get data from these modules without building a complete engine.

but this is a topic i'm not really well versed. Maybe @Nilgiri can weigh in?
 

Zafer

Experienced member
Messages
4,877
Reactions
8 7,557
Nation of residence
Turkey
Nation of origin
Turkey
Starter system, fuel delivery system, electric power generating system, lubrication system are the main subsystems that can be independently tested without igniting
the engine.
 

Nilgiri

Experienced member
Staff member
Administrator
Aviation Specialist
Messages
10,395
Reactions
130 21,076
Nation of residence
Canada
Nation of origin
India
S
i am speaking of component level testing of different subassemblies. there could be specialized testing equipment and rigs to get data from these modules without building a complete engine.

but this is a topic i'm not really well versed. Maybe @Nilgiri can weigh in?

Some examples

 

zio

Contributor
Messages
458
Reactions
10 626
Nation of residence
Turkey
Nation of origin
Turkey
And this one has cavitation propulsion?
I do not think so but may be a bigger,longer,heavier,akya for long endurance.There is no limitation of subs torpedo tubes,but they may go for exactly the same akya totpedo,its not clear.
 

Ripley

Contributor
USA Correspondent
DefenceHub Diplomat
Messages
950
Reactions
31 2,874
Nation of residence
United States of America
Nation of origin
Turkey
And let’s not forget that if we take his words literally, then by integration they mean just installing the engine, introducing the engine to the plane. In such case, a production line plane will be even beyond 2032.
Arda Mevlütoğlu:

“If the integration process for the aircraft begins in 2032, this means the flight testing process would start around 2032-33, and if everything goes smoothly, it would be completed at the earliest in the mid-2030s. +”

 

No Name

Contributor
Messages
558
Reactions
8 565
Nation of residence
Australia
Nation of origin
Afghanistan
Arda Mevlütoğlu:

“If the integration process for the aircraft begins in 2032, this means the flight testing process would start around 2032-33, and if everything goes smoothly, it would be completed at the earliest in the mid-2030s. +”


The plan was to build the prototype in 2026, followed by integrating just one engine into the KAAN in 2028/2029 as a test. The goal was to have a fully domestic fighter with a domestic engine for production by 2032.

Has that changed, or are these people just reading too much into it?
 

Ripley

Contributor
USA Correspondent
DefenceHub Diplomat
Messages
950
Reactions
31 2,874
Nation of residence
United States of America
Nation of origin
Turkey
The plan was to build the prototype in 2026, followed by integrating just one engine into the KAAN in 2028/2029 as a test. The goal was to have a fully domestic fighter with a domestic engine for production by 2032.

Has that changed, or are these people just reading too much into it?
The time table of the project moves back and forth a lot tbh. So, I’d read that as changes and rearrangements as the situation requires them. Honestly, there might have been moments where some phase(s) had been rushed due to political considerations but not project demolishing proportions imho.

The production line aircraft with fully developed, matured satisfactory production quantities of domestic engine(s), however, .. Now that’s another ball game.
 

TheInsider

Experienced member
Professional
Messages
4,631
Solutions
1
Reactions
43 16,114
Nation of residence
Turkey
Nation of origin
Turkey
I double checked my sources, and they insist that the first fighter with the national engine will be delivered in 2032-2033 (2032 at the earliest). At this point, we should wait and see how the project unfolds.
 

Saithan

Experienced member
Denmark Correspondent
DefenceHub Diplomat
Messages
9,370
Reactions
48 21,124
Nation of residence
Denmark
Nation of origin
Turkey
I believe the sales contract of KAAN is worse than T129 to Pakistan. I feel sorry for Indonesia, they should have gone with F16 or EF. But if they can use the deal to get better offers from others I hope they will get them.
 

Merzifonlu

Contributor
Think Tank Analyst
DefenceHub Diplomat
Messages
751
Reactions
26 2,267
Nation of residence
Turkey
Nation of origin
Turkey
At this point, we should wait and see how the project unfolds.
In this case, your sources contradict @orko_8. I assume both are correct.

I think things will unfold as follows: 20 Unit Block-10 Kaans will be produced in 2029, but they won't be equipped with the F110 as expected. Instead, they'll be equipped with the immature TF35000.

In 2032, the mature TF35000 engine will be officially integrated into the Kaan. Of course, this integration will only be on paper, as the TF35000 engine will have already flown on the Kaan between 2029 and 2032.
 