There is an alternative kara akya is loading……..
What?
Wrong thread, maybe

Latest Thread
There is an alternative kara akya is loading……..
What?
If you are talking about parts Q/C tests, that is an issue that they should be doing now. They have come to a stage where they are ready to build a prototype. In virtual world and in computer drawings they have an engine with each part to be produced already specified to the quality level they demand off of it.since they specifically utter "early tests" for 2026, I assume it won't be a fully built engine but some modular tests to validate their assumptions before committing to a prototype.
i am speaking of component level testing of different subassemblies. there could be specialized testing equipment and rigs to get data from these modules without building a complete engine.If you are talking about parts Q/C tests, that is an issue that they should be doing now. They have come to a stage where they are ready to build a prototype. In virtual world and in computer drawings they have an engine with each part to be produced already specified to the quality level they demand off of it.
Early test of an engine has to be a test on a complete engine.
Say they are aiming for the engine’s fan to rotate at 4000 to 5000rpm and LP spool to spin at 12000 to 15000rpm and HP spool to spin more than 20000rpm; they would first run it at very low rpm levels and check the performance and wear and tear on parts. Accordingly new parts replace sub par units. When the engine is responding within a given tolerance level then the so called first ignition is made. That is when the engine is pushed to its optimum available rpm. At least that is my understanding.
I can’t imagine any other way an early test can be done on an engine. The engine has to work as a whole to be tested. You can’t test individual parts of a turbofan if the engine is not working.
i am speaking of component level testing of different subassemblies. there could be specialized testing equipment and rigs to get data from these modules without building a complete engine.
but this is a topic i'm not really well versed. Maybe @Nilgiri can weigh in?
I do not think so but may be a bigger,longer,heavier,akya for long endurance.There is no limitation of subs torpedo tubes,but they may go for exactly the same akya totpedo,its not clear.And this one has cavitation propulsion?
Arda Mevlütoğlu:And let’s not forget that if we take his words literally, then by integration they mean just installing the engine, introducing the engine to the plane. In such case, a production line plane will be even beyond 2032.
Arda Mevlütoğlu:
“If the integration process for the aircraft begins in 2032, this means the flight testing process would start around 2032-33, and if everything goes smoothly, it would be completed at the earliest in the mid-2030s. +”
The time table of the project moves back and forth a lot tbh. So, I’d read that as changes and rearrangements as the situation requires them. Honestly, there might have been moments where some phase(s) had been rushed due to political considerations but not project demolishing proportions imho.The plan was to build the prototype in 2026, followed by integrating just one engine into the KAAN in 2028/2029 as a test. The goal was to have a fully domestic fighter with a domestic engine for production by 2032.
Has that changed, or are these people just reading too much into it?
In this case, your sources contradict @orko_8. I assume both are correct.At this point, we should wait and see how the project unfolds.