Now, we can say "hizli tren" not like "hızlandırılmış tren".National train with Aselsan engineered systems hit 250km/h speed, breaking its previous 240km/h speed record.
Last edited by a moderator:
Now, we can say "hizli tren" not like "hızlandırılmış tren".National train with Aselsan engineered systems hit 250km/h speed, breaking its previous 240km/h speed record.
The BAE Systems demonstrator will use EJ200 engines. First flight expected end 2027/early 2028.There is no decisive picture that would give away the actual innards of the Tempest Engine. All we can see and gather from this picture and from various other more detailed ones, is that there are provisions for very large electrical power generation. The engine looks like it comprises of:
3 stages LP compressor
6 stages HP compressor
1 stage HP turbine
1 stage LP turbine
We know that Japanese used 5th gen single crystal turbine blades on their totally indigenous IHI XF9-1. If RR is going to use similar we do not know.
This engine does not seem to have adaptive cycle tech. Yet 6th generation jets should fly very very high at much faster speeds.
Until first prototype flies we won’t know much. Even then they may use an engine that is not meant for the actual tempest plane. (First EF prototype had flown with RB199 tornado engines)
All modern western jet engines use single crystal turbine blade technology.EJ200 uses single crystal blade technology so I guess the GCAP engine will use that technology.
TF6000 : Still in development stage. But coming close to its usable stage. Required parameters have been archived mostly. TEI is planning to deliver an engine to be integrated to Kizilelma before end of year or early next year.In terms of designed/built/run/in testing/certificated what is the current position with TF6000, TF10000, TF35000?