Now, we can say "hizli tren" not like "hızlandırılmış tren".National train with Aselsan engineered systems hit 250km/h speed, breaking its previous 240km/h speed record.
Last edited by a moderator:
Latest Thread
Now, we can say "hizli tren" not like "hızlandırılmış tren".National train with Aselsan engineered systems hit 250km/h speed, breaking its previous 240km/h speed record.
The BAE Systems demonstrator will use EJ200 engines. First flight expected end 2027/early 2028.There is no decisive picture that would give away the actual innards of the Tempest Engine. All we can see and gather from this picture and from various other more detailed ones, is that there are provisions for very large electrical power generation. The engine looks like it comprises of:
3 stages LP compressor
6 stages HP compressor
1 stage HP turbine
1 stage LP turbine
We know that Japanese used 5th gen single crystal turbine blades on their totally indigenous IHI XF9-1. If RR is going to use similar we do not know.
This engine does not seem to have adaptive cycle tech. Yet 6th generation jets should fly very very high at much faster speeds.
Until first prototype flies we won’t know much. Even then they may use an engine that is not meant for the actual tempest plane. (First EF prototype had flown with RB199 tornado engines)
All modern western jet engines use single crystal turbine blade technology.EJ200 uses single crystal blade technology so I guess the GCAP engine will use that technology.
TF6000 : Still in development stage. But coming close to its usable stage. Required parameters have been archived mostly. TEI is planning to deliver an engine to be integrated to Kizilelma before end of year or early next year.In terms of designed/built/run/in testing/certificated what is the current position with TF6000, TF10000, TF35000?
Is that why the engine delivery is delayed or are they planning to provide such engines without the aforementioned cooling features?
- TF6000 to be delivered to Baykar to fly in Kızılelma prototypes expected to happen in 3-6 months (some cooling features are not implemented)
I have no clue but I am guessing they will implement the cooling features in stages. This initial configuration still works but probably has shorter service life at full power of the engine.Is that why the engine delivery is delayed or are they planning to provide such engines without the aforementioned cooling features?
Bro,1000 engines have been produced of the Kath series. Production of the first one(3700) started in 2022 so roughly 222 engines a year although I guess production numbers were relatively low in 2022 and 2023 since it was a new production line and low order numbers so we can assume the bulk of production happened since 2024. if we assume that overall numbers in 2022 and 2023 were under 200 the average would be more like 320 a year from 2024 until today.
Sorry I meant ktj 3200Bro,
Your timelines are a little off. Apparently before KTJ 3700, it was the KTJ 3200 that was produced for SOM and Atmaca missiles.
KTJ 3200 engines’ serial production started early 2022.
Then it was KTJ 3700 serial production in January 2024. These were for Kara Atmaca missiles.
Then in 2025 the KTJ 1750’s serial production started for CAKIR AShM.
It has to be remembered that the missiles these propel are million dollar missiles. SOM missile is estimated to be around 1.5 to 2 million dollars for export and probably best part of a million dollar for us. Atmaca missiles to Malaysia were 3.3 million each. Kara Atmaca is probably going to cost 1.5 to 2 million each.
CAKIR missile will probably be in excess of 600 thousand dollars too.
So 1000 engines will result in 2+ billion dollar worth of munition having been manufactured in around 3 to 4 years. That is a lot of necessary but dead financial investment.
Where did you get missile prices ? Source?Bro,
Your timelines are a little off. Apparently before KTJ 3700, it was the KTJ 3200 that was produced for SOM and Atmaca missiles.
KTJ 3200 engines’ serial production started early 2022.
Then it was KTJ 3700 serial production in January 2024. These were for Kara Atmaca missiles.
Then in 2025 the KTJ 1750’s serial production started for CAKIR AShM.
It has to be remembered that the missiles these propel are million dollar missiles. SOM missile is estimated to be around 1.5 to 2 million dollars for export and probably best part of a million dollar for us. Atmaca missiles to Malaysia were 3.3 million each. Kara Atmaca is probably going to cost 1.5 to 2 million each.
CAKIR missile will probably be in excess of 600 thousand dollars too.
So 1000 engines will result in 2+ billion dollar worth of munition having been manufactured in around 3 to 4 years. That is a lot of necessary but dead financial investment.
This was discussed here before. If you read the old posts you would not have asked this question .Where did you get missile prices ? Source?
envantermedya.com