Latest Thread
If it will be 3000 tons then it will be 77.25 meters long and 7.2m wide if it will have similar aspect ratio to the Reis class..So Milden will be 3000 ton design, VLS and IDAS possiblilties...![]()
If it's STM, it can't be the TS1700 (1,700-tons). It must be something else. I hope the Turkish Navy is asking for VLS -- would be an effective way to add land-attack without using up the torpedo bay capacity.Are we still expecting MILDEN to be this design, or the one STM has presented ?
View attachment 2637
Are we still expecting MILDEN to be this design, or the one STM has presented ?
View attachment 2637
Milden is a project governed and owned by DzKK, STM can not present the conceptual design on their own, on their website freely -- at least not before than it is unveiled by DzKK.Are we still expecting MILDEN to be this design, or the one STM has presented ?
View attachment 2637
part 3
It is very good that the design will be completed in 2023. If the construction work starts in 2023, we can see MİLDEN from 2030 in the inventory. Of course, some subsystems may not catch up. In this case, it can be supplied from foreign countries such as Germany.part 3
Bro that's just a sketc up , or like what we can do work.Most likely, MilDen will be shaped on existing concept revealed in 2017 but next generation features will be taken into consideration in active design phase.
View attachment 5269