As you probably know a jet fighter like this being produced from scratch is an ever evolving project. Every single prototype produced will serve the purpose to improve upon the previous one; until it is decided it is mature “enough” to be applied to serial production. Whilst serial production is being realised, the plane’s design and evolution doesn’t stop. It is carried on and new ideas and parts are added to the next block.So, first near production-representative prototype will start test flights 2025. In 2026 3/4(?) aircraft will be conducting test flights?
Will TAI start production before testing is complete?
Here the important point is, when TAI will say the block 10 is ready for serial production. We have nearly 3.5 to 4 years for this to happen according to the last timeline given to us. Once BURFIS and air to air missiles with major avionics are integrated to the plane it can start it’s interceptor role. Then other missiles and munitions can be integrated in time until block 20 comes along.
There is no completion of testing. This plane will evolve during testing and manufacturing towards being 6th generation , or at least 5.5 generation.
Once it can pass through the basic requirements it could start serving the airforce in one form or another as a 4.5 generation aircraft.