The design is available at Dearsan's website, but since those can deploy RHIB, could also deploy a USV within the SWL of the winch. They might also equip the ship with a heavier winch to support USV operations.Any chance those ships will employ USVs?
In my opinion there will be another MCMW project in the following years, where we will see a larger MCMW similar to Belgian design with multiple USV and UAV operations.
This is my source and more or less, the acquisition follows with a delay and shifts between the projects. NG-MH is given to Dearsan (for the first prototype that will go through evaluation) and will follow with MKT (MCMW) vessel designed / built either by Dearsan or another.
TF-100 was never I-Class. But let's pretend it is.
You don't simply build first of the optional hulls (either for TF-2000 or I-Class) in the military shipyard. TF-100 was a whole new design in the past, likely split in two and merged to I-Class and TF-2000 projects. Navy has got a way to get 8 more hulls (+4 TF-2000 and +4 I-Class) In place of the TF-100.
Previous formation has been;
4 I-Class (+4 Optional), 4 TF-2000 (+3 Optional) + 4 TF-100, which transformed to;
8 I+Class (+Options), 8 TF-2000 (+Options).
Also notice NG MCMW and NG MHV are separate projects. Dearsan has secured the deal for one of these, for prototype construction and one another will be conceptualized by another company in cooperation with the Navy DPO.
This was the SSB's plan earlier, each first hull of the new designs are to be built in military shipyards, and follow up orders are to be built by private shipyards. All in all TF-100 was a planned new design and let go in the last year.
The table is mostly valid as of 2024.
View attachment 71049
Last edited: