Latest Thread
We first will have Milden-I, then Milden-II and maybe lastly what they call as "Nukden". Officially circulating with the high command so they have it in the long term plans since awhile ago, but "long term" here is crucial. Probably referrring to 20+, 30+ years from now.
Yeah I was as surprised when I was going through whatever was said about Tayfun. Shame that I missed it 2 years ago when listeing to the interview.Yes
I would be happy if someone proves otherwise.
They literally say here that after a certain achieved range, they stop giving information about the range. So can you please tell me at which minute and second Mr. Ikinci gives that information about Tayfun? Then they talk about Siper Block-I with 100 km range and Siper Block-II with 150 km range.Yeah I was as surprised when I was going through whatever was said about Tayfun. Shame that I missed it 2 years ago when listeing to the interview.
![]()
Tayfun Serial Production Started | TURDEF
The serial production of the Tayfun missile, which was test fired from Rize-Artvin airport last week, started.turdef.com
"According to İkinci, Tayfun Block 1 has approximately a range of 1000 km, and Block 2 will have a 1500 km range."
15:50 ( Let's examine the example he gave mathematically, they reached a maximum of 1500 km. )They literally say here that after a certain achieved range, they stop giving information about the range. So can you please tell me at which minute and second Mr. Ikinci gives that information about Tayfun? Then they talk about Siper Block-I with 100 km range and Siper Blcok-II with 150 km range.
At that minute they talk about satellite launching system.15:50 ( Let's examine the example he gave mathematically, they reached a maximum of 1500 km. )
SSB President Tayfun stated that the launch system was developed jointly.At that minute they talk about satellite launching system.
@mTT
What are you trying to tell? First of all TurDef writes like Mr. Iknici gave range information about Tayfun, which looks like just wrong. And what you say is imformation about satellite launching system.
@mTT
What are you trying to tell? First of all TurDef writes like Mr. Iknici gave range information about Tayfun, which looks like just wrong. And what you say is imformation about satellite launching system.
SSB and Roketsan have no official range announcement, but there are hidden messages in the statements made.
"Space Program" , "TAYFUN"
I think there will be a 1500km range variant of the Tayfun.
Then they have to indicate that. You can't just write that someone said something.He did not officially provide range information. I think the same as you — I calculated the range based on his comments. TURDEF may have calculated it like I did or obtained the information from other sources
Then they have to indicate that. You can't just write that someone said something.
I don't think that is the case.
It seems there are issues with funding of some projects.
What Kozan means the intrest of the navy and the support is to late or to little as STM started it as their own project but even with goverment support it would still take time because its the domesticly designed and built submarine.I don't think that is the case.
I think he is just sad that STM 500 wouldn't get the contract. The reality is that the STM 500 project's timeline never aligned in a way that would have let STM be part of the procurement process.
The STM 500s timeline states that it will take 6 years to complete, a timeframe that was announced back in 2022. Even if the state gave more funding, it wouldn't have changed anything, most likely.
STM is SSB's company though. Do the logic, state does support STM500, hence it still exists and STM (indirectly SSB) may fund it.What Kozan means the intrest of the navy and the support is to late or to little as STM started it as their own project but even with goverment support it would still take time because its the domesticly designed and built submarine.
Safe to tell preliminary is far ahead than MUGEM's current state. It is more of conceptualization, feasilibility stage with little to none human resources being spared for. Same for NUKDEN, they haven't even bothered to do the concept yet.Ironically aside from the delay on TF2000 production timeline and confirming that MUGEM is still very much in the preliminary design process, we didn't learn anything new from the seminar so far.
So, is the TF 2000 under construction or not? I'm confused.STM is SSB's company though. Do the logic, state does support STM500, hence it still exists and STM (indirectly SSB) may fund it.
Safe to tell preliminary is far ahead than MUGEM's current state. It is more of conceptualization, feasilibility stage with little to none human resources being spared for. Same for NUKDEN, they haven't even bothered to do the concept yet.
It is but it’s like a learning shipSo, is the TF 2000 under construction or not? I'm confused.
He means steal-cut, I guess.It is but it’s like a learning ship
Hisar class,what isit? View attachment 75448