As far as I remember from what UK Unions and press were saying, the factory has got 2 to 3 planes to build before the end of this year when they have no more work in hand. So they need more work to keep the workforce available for tempest. They need work to keep them going until 2030 at least.Abi your conclusion that it does not say anything regarding second hand/used is correct.
Yet, from the context, to conclude that first phase of twenty to be “delivered“ would’ve only been acquired from RAF inventory, has some legitimacy because the next batch of twenty described as the new build. As you pointed, if the UK plant is literally dead, then logically getting from RAF inventory is the only UK option.
At any rate though, not a very decent body of news piece altogether. It‘s rather vague in general. Like you said, must be something about the translation
Also the UK government is under great pressure by the unions and public to give orders to the factory for new Typhoons. So they can easily part with working T2 planes updated to Meteor capability. Because only the later versions of T2 planes are Meteor capable.
As it stands :
According to the provided figures, the RAF’s Typhoon fleet comprises a total of 137 aircraft, distributed as follows:
- Tranche 1 variants make up 22% of the fleet, totaling 30 aircraft.
- Tranche 2 variants, the largest group, consist of 67 aircraft, representing 49% of the total fleet.
- Tranche 3 variants account for 29% of the fleet, with 40 aircraft.
Also as stated at the end of the second file below :
The MOD also states that the decision to withdraw the Tranche 1 fleet is because its software cannot be updated to Tranche 3-standard in the same way the Tranche 2s can. Due to this, the remaining Tranche 1s have been left out of type-specific upgrades and are not able to employ the full range of weapons that the Tranche 2/3s can – such as MBDA’s Meteor beyond-visual-range air-to-air missile (BVRAAM).
Therefore if we are to receive used Typhoons with Meteor missiles, they have to be at least T2. T2s can also be upgraded to T3 to receive Aesa radars.
How BAE plans to keep its Eurofighter Typhoon UK final assembly line alive for GCAP - Breaking Defense
The last two Typhoons on order at the Warton facility are set to be delivered in 2025, meaning BAE needs to find more export customers to keep fresh a workforce it is counting on to make the sixth-gen GCAP fighter in the future.