"MUGEM'S PROPULSION SYSTEM CHANGED"

It was announced that a 2-gas turbine and 4-electric motor propulsion configuration is planned for the National Aircraft Carrier (MUGEM) in the SAHA 2026 project.

Previously, a 4-gas turbine propulsion system was planned for the ship.

They thought 400-500 hundred personnel was enough for a full sized carrier? Fucking hell, I'm glad they changed that as well, poor sods would've died before the month was out.
 

Strong AI

Experienced member
Messages
2,825
Reactions
62 10,231
Nation of residence
Germany
Nation of origin
Turkey
HHnr_EQXkAMIjgB


"MUGEM'S PROPULSION SYSTEM CHANGED"

It was announced that a 2-gas turbine and 4-electric motor propulsion configuration is planned for the National Aircraft Carrier (MUGEM) in the SAHA 2026 project.

Previously, a 4-gas turbine propulsion system was planned for the ship.

Wait, did they translate Pitch as Piç? Is that correct? I don't think so 😂 2 Piç Kontrollü Pervane (CPP)
 

dBSPL

Experienced member
Think Tank Analyst
DefenceHub Ambassador
Messages
2,861
Reactions
123 14,478
Nation of residence
Turkey
Nation of origin
Turkey
"MUGEM'S PROPULSION SYSTEM CHANGED"

It was announced that a 2-gas turbine and 4-electric motor propulsion configuration is planned for the National Aircraft Carrier (MUGEM) in the SAHA 2026 project.

Previously, a 4-gas turbine propulsion system was planned for the ship.

This shows a radical change in MUGEM's propulsion system. Instead of the initially planned four gas turbine (COGAG) mechanical structure, the switch to a combination of two gas turbines and four electric motors indicates a move towards an IFEP (Integrated Fully Electric Propulsion) architecture.

This new structure bears a striking resemblance to the British Queen Elizabeth class. As we know, the QE class also features two Rolls-Royce MT30 gas turbines and four diesel generators providing power to four induction motors operating on two shafts. Considering MUGEM's length of approximately 285 meters and displacement exceeding 60,000 tons, it's likely that the Turkish design team referenced the British school of thought in its propulsion concept, or worked extensively on this model.

The characteristic 'double island' structure of the QE class was designed to optimize the exhaust lines of the gas turbines. Could this update to MUGEM's propulsion system result in a similar chimney layout? On the other hand, could the electric propulsion system, while providing economical cruising at low speeds, also enable the massive electrical infrastructure needed for the future EMALS project on board the ship?

Another question swirling in my mind is whether the recent defense and technology cooperation agreement between the UK and TR will yield any benefits in the MUGEM project.
 

dBSPL

Experienced member
Think Tank Analyst
DefenceHub Ambassador
Messages
2,861
Reactions
123 14,478
Nation of residence
Turkey
Nation of origin
Turkey

Naval Forces Commander Ercüment Tatlıoğlu:

Our national aircraft carrier will be launched on September 27, 2027.
So, we're trying to launch MUGEM simultaneously with the Kocatepe, or at least in the same year. Probably, the steel cutting for the second Tepe vassel will begin when the Kocatepe blocks are assembled in the dock. With a moderate-to-optimistic estimate of 16-18 months of building, the second ship could be launched within the year following Kocatepe. By the 2031-32 period, both first and second Tepe destroyers and the National AC may have passed the acceptance phase.

This, of course, is based on the scenario where the construction of the second ship takes shape as soon as the first destroyer is launched. Unlike the Istif project, the second, third, and fourth Tepe-class destroyers will not be built simultaneously; the construction of the second ship will begin first, and production will proceed according to a sequential schedule. Both the construction model and the urgency at MUGEM suggest, in my opinion, that we won't have to wait too long for the second Tepe destroyer.

The main issue is still the MUGEM air wing. We're not even properly discussing what we can accomplish by 2031-32.
 