To add, Atak 2 was shown on yesterday's program as well, but no flight happened.
View attachment 70960
Did T129 or T625 fly yesterday? Interesting ...
To add, Atak 2 was shown on yesterday's program as well, but no flight happened.
View attachment 70960
This bird is slowly turning into a self own machine for TAI.To add, Atak 2 was shown on yesterday's program as well, but no flight happened.
View attachment 70960
Don't know about 625 but 2 army T129s did a small show.Did T129 or T625 fly yesterday? Interesting ...
Schrödinger's Gökbey continues to be delivered and not delivered.Demiroğlu, who provided information about the delivery program of Turkey's first indigenous helicopter, GÖKBEY, recalled that GÖKBEY performed its "Victory Flight" on August 30. He stated, "We had actually planned our delivery for that time, but due to some delays in tests, we hope to complete our tests and make our deliveries within October. The delays were related to the documentation work for the tests, specifically the certification processes. We expect to see that delivery sometime this month, possibly on October 29 or even earlier."
GÖKBEY helikopteri ilk teslimata gün sayıyor
Ekonomi - TUSAŞ Genel Müdürü Mehmet Demiroğlu, yerli imkanlarla geliştirilip üretilen genel maksat helikopteri T625 GÖKBEY'in ilk teslimatına ilişkin, "O teslimatı, bu ay içinde, belki 29 Ekim'de veya daha önce göreceğiz" dedi.ekonomi.haber7.com
Tracks with Sünnetçi's article from august.Demiroğlu, who provided information about the delivery program of Turkey's first indigenous helicopter, GÖKBEY, recalled that GÖKBEY performed its "Victory Flight" on August 30. He stated, "We had actually planned our delivery for that time, but due to some delays in tests, we hope to complete our tests and make our deliveries within October. The delays were related to the documentation work for the tests, specifically the certification processes. We expect to see that delivery sometime this month, possibly on October 29 or even earlier."
GÖKBEY helikopteri ilk teslimata gün sayıyor
Ekonomi - TUSAŞ Genel Müdürü Mehmet Demiroğlu, yerli imkanlarla geliştirilip üretilen genel maksat helikopteri T625 GÖKBEY'in ilk teslimatına ilişkin, "O teslimatı, bu ay içinde, belki 29 Ekim'de veya daha önce göreceğiz" dedi.ekonomi.haber7.com
The official acceptance of the first 3 T625J GÖKBEY Light Utility Helicopters, which are produced in Military Configuration for the Gendarmerie Aviation Command and defined as Early Entry Helicopters (EDH), is targeted to be completed in the last quarter of 2024 (if there is no setback, the acceptance ceremony is expected to be held on October 29, 2024).
They understood the sentence "2 atak helicopters will come" as "Atak2 will come" ya dreams Atak2 but realities Atak ahahDon't know about 625 but 2 army T129s did a small show.
Per Tolga Özbek, T929 was never supposed to go to Adana and the prototype is currently in Ankara. Looks like a fuckup by the festival's marketing and social media teams.
It was published in 2021.Turkey’s first technology-focused think tank, STM ThinkTech, published a book titled “The Rise of the Turkish Defense Industry and Embargoes / Localization and Nationalization Efforts in Critical Technology, Components, and Subsystems.”
Not much of a competitor to be honest.World won't wait for us while we try to handle our stuff.
I think you'll agree with me in saying a Malaysia that have LAH will be less likely to procure an armed T625 and will be more likely to procure the future LUH and Surion over T625 and T925.Not much of a competitor to be honest.
"TAI continues its efforts to reach a production capacity of four GÖKBEYs per month. GÖKBEY is expected to be delivered with indigenous engines by 2027."
It would have been a mistake not to produce an AW159 equivalent helicopter at home when the Navy's need for helicopters was so acute and the production line for the T-625 was already set up. An AW159 equivalent helicopter may not provide maximum capability, but it can fill the urgent gap until the heavy class navy helicopter arrives, which can be developed as a battlefield utility helicopter and a wide range of system integration can be attempted.Looks like you guys waited for me to deliver the news!
Finally after years of delay, first T625 was officially, fully delivered to gendarme.
4 prototypes completed 1500 flight hours of tests to date.
Starting from 2025, "two additional GÖKBEYs will be delivered to the Gendarmerie, seven to the Land Forces, four to the Air Force, three to the Police Force and three to the Coast Guard, bringing the total number of deliveries to 20. On the other hand, 3 GÖKBEY Air Ambulances will be delivered to the Ministry of Health in 2026."
This first phase of 23 helicopters will be completed in 2026, so almost one a month. We know 3 T625s are already built and were tested but only one was delivered today, and per SSist other two will be delivered in 2025. I wonder what's the reason for that calendar.
"TAI continues its efforts to reach a production capacity of four GÖKBEYs per month. GÖKBEY is expected to be delivered with indigenous engines by 2027."
GÖKBEY helikopteri Jandarma envanterinde: Bir ilk
TUSAŞ, ilk GÖKBEY Genel Maksat Helikopteri’ni Jandarma Genel Komutanlığı’na teslim etti. Düzenlenen törene, Cumhurbaşkanı Erdoğan da katıldı.www.savunmasanayist.com
As mentioned by SSist, no local engine deliveries will be made for the first phase and TS1400 will apparently continue its tests. "T625 with local engines are expected after 2028..."
What's most surprising was this for me however. I wonder if it was a gaffe by Erdoğan. "Plans are underway for the serial production of an additional 57 GÖKBEY helicopters for the needs of the Turkish Naval Forces Command." Should we expect a navalized ASW specialized T625? I wish!
Cumhurbaşkanı Erdoğan: Savunma sanayisinde tam bağımsız Türkiye hayalimizi gerçeğe dönüştürünceye kadar durmak yok
Cumhurbaşkanı Erdoğan, "Savunma sanayisinde tam bağımsız Türkiye hayalimizi gerçeğe dönüştürünceye kadar bize durmak, dinlenmek, nefeslenmek yok." dedi. - Anadolu Ajansıwww.aa.com.tr
With the mentioning of EDH last month, I don't think we should expect that full production rate until after TS1400 is ready for serial production. Those numbers will be achieved only after it is genuinely ready for full use, so still after 2028. This is not great, it is still very slow and I fear is a shape of things to come in other projects as well, but today was still a good day.It would have been a mistake not to produce an AW159 equivalent helicopter at home when the Navy's need for helicopters was so acute and the production line for the T-625 was already set up. An AW159 equivalent helicopter may not provide maximum capability, but it can fill the urgent gap until the heavy class navy helicopter arrives, which can be developed as a battlefield utility helicopter and a wide range of system integration can be attempted.
If the production target of 4 helicopters per month can be reached at the beginning of 2026, this means that around 200 helicopters will be produced before 2030, which roughly corresponds to the replacement of at least +150 UH-1/204/205/212(which are counting the days for retirement in different force commands including gendarmerie), and the additional purchases of the ministries of forestry and health etc. In 2027, the indigenously designed engine will arrive, and if the work has already started, maybe we will see a Wildcat equivalent Denizbey around 2028-2029.