Must've missed this. Though the footage seems old. Or it's the second prototype on the assembly line...
Must've missed this. Though the footage seems old. Or it's the second prototype on the assembly line...
There's no way they can fly this before the year is out. Just my two cents.
There's no way they can fly this before the year is out. Just my two cents.
seems like the second prototype and an old photoThere's no way they can fly this before the year is out. Just my two cents.
It's not about being doom and gloom. I don't care if they'll fly it before the year's end or three months later and what not. As long as I see a veritable progress, I'm good. And I'm pretty content with TAI's rate of progress so far.I see a few people here complaining about TAI, huffing and puffing as if it was Lockheed Martin or Boeing.
TAI is doing amazing work with so many parallel projects in record time. Let's not forget that many of these are first time endeavours holding fair amounts of risks and/or teething problems with them.
Try to cut them some slack and appreciate their efforts instead of being Debbie Downers all the time.
This informations has been written and said dozens of times. It was a pretty empty program. Mete Yarar seemed to give the good news of an atomic bomb when he said wait for tomorrow for the program.what a impatient people, like they are obligated to show people something. The program is informative program. A lot of said things...
They don't allow pictures, when the time comes they will share it.
Probably he had never heard of these "design review" words in his life.View attachment 46899
HÜRJET New Generation AJT’s CDR Phase Completed
The Critical Design Review (CDR) Phase of the HÜRJET, twin-seat, single-engine supersonic new generation Advanced Jet Trainer (AJT) and Light Combat Aircraft (LCA) was completed in early March 2021. According to original schedule the CDR Phase should have been completed in August 2020 (To+36...www.defenceturkey.com
The current schedule for Hurjet is already an updated one since the project already suffered delay. It is safe to say some concerns over the progress of the aircraft development are justified. However, I don't think TAI has revised the plan since the company completed the Critical Design Review Phase (CDR) back in 2021 so here is hope that TAI sticks with the new schedule.
It would have been better if this Mete Yarar guy had asked about the Test Readiness Review (TRR) Phase which would have given us more insignt of the progress. Has the project passed TRR already? In the original schedule, it was one year (12 mths) after CDR and this means TAI should have achieved TRR during the first half of this year. TAI was not shy of announcing the completion of CDR and TRR was one of milestones of the original published schedule so it shouldn't even be a military secret.
So JV doesn't come under embargo, I liked this western Model of business.Mr Ismail Demir:
"We think that the probability of a problem in Hürjet's engine supply is low."
"If we meet a problem, our engineers working on the MMU engine can create an engine for Hürjet in a short time in future."
Why the f don’t they create that engine then ?Mr Ismail Demir:
"We think that the probability of a problem in Hürjet's engine supply is low."
"If we meet a problem, our engineers working on the MMU engine can create an engine for Hürjet in a short time in future."
Because we have more important work at hand right now and this class of engine is not made for the top gun.Why the f don’t they create that engine then ?
Dude, I usually just ignore your post because of how much of a brown nose you are.Because we have more important work at hand right now and this class of engine is not made for the top gun.
Dude, I usually just ignore your post because of how much of a brown nose you are.
you non-challantly reject any notion of critical thinking when your political faction is involved.
Luckily I’m not the only one believing Hürjet flying is more important than MMU.
Because at the end of the day if you can’t even make a light/unarmed jet then how the f are you going to make something better.
I don’t want to hear empty promises, and neither do most people here. We want solid progress report, something tangible. Hope, and belief belongs in Mosques and Churches.
Logical thing to do is to produce a smaller engine before you go bigger. As the proverb go: ” walk before you run”!Why the f don’t they create that engine then ?