isn’t this a capture from the video they released some time ago? Or is this a new one?
Turkish Super Hornet. Love it.Hürjet prototype for Iron Bird
View attachment 51977
It's not for the Iron Bird though like @Radonsider said. Don't take this as a personal reply. The Iron Bird test facility is not an area to take a prototype to. You don't have a working prototype stationed there. Essentially every single equipment present on the actual aircraft is on sight, but not the aircraft itself. The test facility usually features all cockpit instruments so that flight can be simulated. The Iron Bird of Hürjet has been active for quite some time now. It isn't a new addition to TAI. The static test prototype has always been intended for static testing, the whole Iron Bird thing wouldn't work because it actually lacks the control surfaces and the actuators with them. Most cockpit instruments are not present either. So how and what would they be testing exactly?Turkish Super Hornet. Love it.
So @Bogeyman was right all along.
Yea potentially. This doesn't mean an embargo is in place tho. Because what I heard was this... "There are no issues with the engine procurement", "there are no embargoes". It seems to be all clouded at the moment.So @Bogeyman was right all along.
Temel Kotil called the GE CEO and scolded him. Now they will deliver us the engine produced for another aircraft.So @Bogeyman was right all along.
What??!?Temel Kotil called the GE CEO and scolded him. Now they will deliver us the engine produced for another aircraft.
What is going onTemel Kotil called the GE CEO and scolded him. Now they will deliver us the engine produced for another aircraft.
I don't know all that detail.What??!?
So they don't even produce for Hürjet?
Or the production line is too crowded?
Ok thanks, it looks like something fucked upI don't know all that detail.
I think no, F110 would probably have a bigger line with less orders than F404'sWeird F110 gets delivered without delay but F404 does not?
Shouldn't the F404 line be less crowded though?
I fucking love Temel KotilTemel Kotil called the GE CEO and scolded him. Now they will deliver us the engine produced for another aircraft.
On the contrary, the engine of Hürjet, which will fly, will arrive in January. The integration of the engine is expected to be completed in 2-2.5 months.@Bogeyman it could be the engines that were planned to be procured for the 3rd and 4th prototypes. Because at one point we were set to see those engines Something doesn't add up here.