Does anyone know if the original afterburner version of Kaveri is slated for revival? With 200+ Tejas of both types likely to be in IAF service, 200+ engines should be needed for through life engine replacements. What about the 'Marut' trainer, too?
I believe that SAFRAN sorted the vibration and screech problems on the Kaveri, so what stops Kaveri being turned into a GE F404 alternative for application to suitable Indian aircraft?
Does that imply that GTRE has achieved 80kN reliably with an afterburner?Yes, coincidentally as you wrote that, this got posted just earlier:
Does that imply that GTRE has achieved 80kN reliably with an afterburner?
What is an 'EoL', please. Is GTRE inviting Indian companies to bid for a contract to make blades + vane assemblies already designed?
My bad - I thought you wrote EOL.Expression of interest, i.e getting price quotes etc
Yes its production of design already frozen since this is the cold section stuff....and a number of companies (PTC, Midhani) have invested in forging and other capital machinery from safran et al.
Hot section and afterburner etc we will have to give some time to see where those stand.
This conduit in progressing the Kaveri is a necessary hedging, to see and test what secure domestic supply chain can do at this juncture.
My bad - I thought you wrote EOL.
How long will deliberation of quotes take? Any reason not to start work now on getting the afterburner design frozen and tested?
Interesting.We will have to see. Only folks with detailed inside knowledge of the project situation would know the answer to the latter.... how much of a role it played in stalling the maturation of first Kaveri with the below par test results. Likely the whole hot section is a subpar result currently, the afterburner can only work with what it receives (afterburners themselves are not so complicated).
RR spends more than a billion US dollars a year on R&D and development. As far as I know GTRE has spent less than half a billion US dollars on Kaveri over 25+ years.
India is considering paying at least 5 billion USD to develop an engine for AMCA. Does GOI not consider it worthwhile to invest 2%-5% of that (my guess) to get a viable, indigenous engine for Tejas finished? OK, admittedly India needs to have developed the know how to do that or will be forced to buy it in (which would add a lot to the cost).
Hey buddy I'm new here just wanna know what is mtow of Tejas I was arguing with a guy it's 14.3 tons now they say it's 13.5 tons..That's apples and oranges. That's like comparing NASA or SpaceX with ISRO and saying ISRO doesnt spend enough (when obviously ISRO has produced results)...especially in USD conversions. Especially given RR massive commercial arm, not to mention IP acquisition budget from university research (that are not included in govt run RnD budget in most developing countries).
If you have RR specific military turbofan lab RnD spend and add to GTRE all it acquires from research pool outside of it at nominal cost compared to RR....and do the same for say China and Russia, we might start to get something to compare. But these numbers are not ever clearly delineated by anyone.
Throwing money at some problems isn't going to solve them. If your top human capital in materials research is used in ballistic missiles, nuclear engineering and space for example (as these have been prioritised for decades given the nuclear deterrent needed), its a supply constraint to what you can do with other material research intensive study. Till you can grow this more and take on more and then allocate and fund more.
Lot of that budget is capital outlay. The literal machinery and training needed to produce engines in serial production. So again you are comparing very glaringly different things. How can this money be allocted to Kaveri if there's nothing to serially produce yet (unlike say the GE 414)? The feedback flow from serial production into the Kaveri is a route India will harness, so there is benefit to the Kaveri from the AMCA engine program.
You can do search in the Turkish propulsion thread with "GE" search string. I've been over all of this there with their similar efforts.
Hey buddy I'm new here just wanna know what is mtow of Tejas I was arguing with a guy it's 14.3 tons now they say it's 13.5 tons..
And Tejas mk1 weight 7070kg whereas Tejas mk1a is reduced to 6560kg now so it's mtow will increase ?
Are deliveries of Tejas Mk1A going to start in March?Digital Flight Control Computer for Tejas Mk1A Flown successfully
In a significant development towards Tejas Mk1A programme, the Digital Fly by Wire Flight Control Copib.gov.in
Are deliveries of Tejas Mk1A going to start in March?