The current order of 83 jets with this will put the total number of LCA Tejas Mk-1A at 180 along with 40 Mk-1

Also, as per this report the number of Mk-2 models has been increased from 106 to ~200!

Just as well....we're gonna be needing a whole lot of 4.5 gen single-engine planes if we want to approach any conflict with a high sortie rate throughout. All those flashy Rafales, MKI-Upgrades & AMCAs are well & good, but without the backbone of single-engine jets which put up the bulk of sorties flying CAP & CAS, defending the airspace & preparing the conditions for Air Superiority & Strike platforms to come and exploit, that would truly make the difference in determining if we can maintain the Air war long enough to turn the tide.

I'm glad we never swayed from a Western engine (F404/414) on the Tejas platforms...we'd never be able to put up the required sortie rate & flight hours per year with a Russian powerplant.
 
Last edited:

Spitfire9

Contributor
Think Tank Analyst
Messages
536
Reactions
9 693
Nation of residence
United Kingdom
Nation of origin
United Kingdom
HAL upped FAL capacity to 8 frames a year around 2016 IIRC. A second line was commissioned 2021, giving FAL capacity of 16 frames a year. Currently 2 frames are scheduled for delivery by end March this year. 8 deliveries are scheduled in 2024/2025 financial year, 16 in 2025/2026 financial year and later years. If Nashik FAL is commissioned in 2025, I think that the production rate could reach 24 per year 2027 onwards.

A 4th assembly line for exports some time later? On that basis I suspect that Argentina will go for F-16 and Philippines will select F-16 or Gripen E.
Replying to myself, Janes reported 2 days before the first Mk1A was due for delivery that HAL announced the delivery schedule would not be met. Q2 2024 now? Q3 for first delivery to IAF? It will be interesting to see if HAL can catch up on the delivery schedule by the end of the 2024/2025 financial year.

I hear that Nashik is going to be used to assemble more Su-30's. If so, I think that Mk1A production capacity falls to 16 per annum for the foreseeable future.
 

Rajendra Chola

Committed member
Messages
252
Reactions
88
Nation of residence
Canada
Nation of origin
India
Replying to myself, Janes reported 2 days before the first Mk1A was due for delivery that HAL announced the delivery schedule would not be met. Q2 2024 now? Q3 for first delivery to IAF? It will be interesting to see if HAL can catch up on the delivery schedule by the end of the 2024/2025 financial year.

I hear that Nashik is going to be used to assemble more Su-30's. If so, I think that Mk1A production capacity falls to 16 per annum for the foreseeable future.

Only 12 more Su max. Super Sukhoi upgrade hasn’t been started However HAL Nashik has advertised they will be delivering 2 mk1A by March next year.
Means work has already started there.

Engine delivery is another issue. GE hasn’t delivered engines as per contract . They have supply chain issues
 

Spitfire9

Contributor
Think Tank Analyst
Messages
536
Reactions
9 693
Nation of residence
United Kingdom
Nation of origin
United Kingdom
Only 12 more Su max. Super Sukhoi upgrade hasn’t been started However HAL Nashik has advertised they will be delivering 2 mk1A by March next year.
Means work has already started there.

Engine delivery is another issue. GE hasn’t delivered engines as per contract . They have supply chain issues
I wonder how long it will take to switch from Mk1A assembly to Su assembly at Nashik, build 12 x Su then switch back to Mk1A assembly. I also wonder how many unused GE 404 there are in India and the current delivery rate from GE. I know that GE is raising the delivery rate to 20 per year but have no idea when they will get to that level.
 

Rajendra Chola

Committed member
Messages
252
Reactions
88
Nation of residence
Canada
Nation of origin
India
I wonder how long it will take to switch from Mk1A assembly to Su assembly at Nashik, build 12 x Su then switch back to Mk1A assembly. I also wonder how many unused GE 404 there are in India and the current delivery rate from GE. I know that GE is raising the delivery rate to 20 per year but have no idea when they will get to that level.

Either they have increased the assembly area or decreased the number of Su jigs there. They can’t do both without expansion. Particularly after Super Su project kicks in.
Older GE F404 engines can’t be used as HAL uses the IN 6 version. The earliest prototypes used a different version of F404. I think it’s only after 2012, we zeroed in for this particular variant of F404. Not sure who easy it’s to convert older model to IN6 version.

GE needs to increase delivery to 24 per year. Supply chain issues are there. I don’t think they can supply 20 before 2026. Remember KA 50, Boeing T7A are also vying for the same engine. Hurjet is the latest entrant to the engine user. Plus they have to supply new engines to Saab Gripen, F18 a/b/c/d MLU to various air forces. Some modules and suppliers are the same for 404&414.

This problem with continue with F414, but we have local assembly planned. How much will still be imported for F414, no one knows.
 

Spitfire9

Contributor
Think Tank Analyst
Messages
536
Reactions
9 693
Nation of residence
United Kingdom
Nation of origin
United Kingdom
Either they have increased the assembly area or decreased the number of Su jigs there. They can’t do both without expansion. Particularly after Super Su project kicks in.
Older GE F404 engines can’t be used as HAL uses the IN 6 version. The earliest prototypes used a different version of F404. I think it’s only after 2012, we zeroed in for this particular variant of F404. Not sure who easy it’s to convert older model to IN6 version.

GE needs to increase delivery to 24 per year. Supply chain issues are there. I don’t think they can supply 20 before 2026. Remember KA 50, Boeing T7A are also vying for the same engine. Hurjet is the latest entrant to the engine user. Plus they have to supply new engines to Saab Gripen, F18 a/b/c/d MLU to various air forces. Some modules and suppliers are the same for 404&414.

This problem with continue with F414, but we have local assembly planned. How much will still be imported for F414, no one knows.
Hold up with T-7 could help F404 supply to other customers in the next year or two.
 

Gessler

Contributor
Moderator
India Moderator
Messages
896
Reactions
45 2,016
Nation of residence
India
Nation of origin
India
With ASRAAM

Tejas ASRAAM.jpeg
 

Spitfire9

Contributor
Think Tank Analyst
Messages
536
Reactions
9 693
Nation of residence
United Kingdom
Nation of origin
United Kingdom
Does anyone have any info regarding when Mk1A will be delivered to IAF? I think the contract signed in 2021 stipulated delivery of 2 by 1st April 2024. IIRC it was announced 29th March that that would not be happening. The story I heard is that IAF wanted a modification (which cannot have been in the contract).

Is there a new schedule announced for deliveries? 3 months have passed since the first 2 Mk1A were due to be delivered and it would be good to have some idea when IAF will start receiving them.
 

Nilgiri

Experienced member
Moderator
Aviation Specialist
Messages
9,761
Reactions
119 19,783
Nation of residence
Canada
Nation of origin
India
Does anyone have any info regarding when Mk1A will be delivered to IAF? I think the contract signed in 2021 stipulated delivery of 2 by 1st April 2024. IIRC it was announced 29th March that that would not be happening. The story I heard is that IAF wanted a modification (which cannot have been in the contract).

Is there a new schedule announced for deliveries? 3 months have passed since the first 2 Mk1A were due to be delivered and it would be good to have some idea when IAF will start receiving them.

AFAIK, the delays have been related to the certification procedures needed for the new stuff being incorporated into the first 3 airframes. The airframe(s) are ready and all otherwise. This issue (given these are the first 3) wont kick in for rest of production run.

We can expect the deliveries at some point this year, we will have to see.


"The deliveries of aircraft are expected to commence sometime in 2024 and will be delivered at the rate of 16 aircraft annually."
 

Spitfire9

Contributor
Think Tank Analyst
Messages
536
Reactions
9 693
Nation of residence
United Kingdom
Nation of origin
United Kingdom
From the airforce-technology.com link above

India’s Defence Research and Development Orgnaisation (DRDO), a branch within the Ministry of Defence (MOD), has handed over indigenously built components to an industrial supplier, Hindustan Aeronautics Limited (HAL), to be fitted onto the next Tejas fighter iteration, the Mark 1A (Mk1A).

Building on the Indian Air Force’s original Tejas fighter jet, which entered service in 2016, the Mk1A will cost $4.5bn over the next ten years, according to GlobalData. The DRDO has widened the indigenous supply chain, having sourced various components across India’s fledgling defence industry.

As part of these efforts, the DRDO has handed over the first batch of cutting-edge actuators and an airbrake control module to HAL for the LCA Tejas Mk1A.

Talk about obfuscation! What seems to have happened is that some indigenous components are late. Why not just say so months ago? If the article is to be believed, DRDO appears to have screwed up in widening the indigenous supply chain with the result that Mk1A entry into IAF service is delayed yet again.

Come on India, for goodness sake start getting organised. If you don't, many of the problems that have hit Tejas will hit Mk2, TEDBF and AMCA as well.
 
Last edited:

Nilgiri

Experienced member
Moderator
Aviation Specialist
Messages
9,761
Reactions
119 19,783
Nation of residence
Canada
Nation of origin
India
For Defence this media entity "The Print" is a waste of time. They are not tech savvy, just try to cover every geopolitical thing a.s.a.p.