Indonesia Indonesian Navy, Tentara Nasional Indonesia-Angkatan Laut (TNI-AL)

deadlast

Committed member
Professional
Messages
155
Reactions
2 357
Nation of residence
Indonesia
Nation of origin
Indonesia
OPV-90

buCba75.jpg
 

R4duga

Experienced member
Messages
1,670
Reactions
2 2,367
Nation of residence
Indonesia
Nation of origin
Indonesia
Emphasize for PT.PAL :
1.Carry out duties sincerely
2.Prioritize safety, zero accidents
3.Understand the contents of the contract, carry out construction referring to the contract. If problems are found, report them to the PPK(CMO, Commitment Making Officer)
4.PAL Indonesia will immediately make a recovery plan for the frigate ship project.
5.Carry out coordination with the Ministry of Defense and the Indonesian Navy's Technical Directorate regarding the weapons that will be installed on the frigate, Prioritize those that have been proven.

6.Immediately implement contract amendments for equipment that undergoes changes.
7.For PT. PAL Indonesia will immediately carry out purchase orders for senkomlek (Communication & Electronic) equipment.

lets hope it does not ended up like malaysia LCS.
1694683031821.png

1694683041775.png
 

Lordimperator

Experienced member
Moderator
Indonesia Correspondent
Indonesia Moderator
Messages
5,046
Reactions
3 2,886
Nation of residence
Indonesia
Nation of origin
Indonesia
4.PAL Indonesia will immediately make a recovery plan for the frigate ship project.
5.Carry out coordination with the Ministry of Defense and the Indonesian Navy's Technical Directorate regarding the weapons that will be installed on the frigate, Prioritize those that have been proven.

6.Immediately implement contract amendments for equipment that undergoes changes.
7.For PT. PAL Indonesia will immediately carry out purchase orders for senkomlek (Communication & Electronic) equipment.

lets hope it does not ended up like malaysia LCS.
View attachment 61128
View attachment 61129
For point 4, did something happen with the project?
 

satria

Contributor
Indonesia Correspondent
Messages
1,213
Reactions
9 1,706
Nation of residence
Indonesia
Nation of origin
Indonesia

Anmdt

Experienced member
Naval Specialist
Professional
Messages
5,535
Solutions
2
Reactions
119 25,122
Nation of residence
Turkey
Nation of origin
Turkey
Emphasize for PT.PAL :
1.Carry out duties sincerely
2.Prioritize safety, zero accidents
3.Understand the contents of the contract, carry out construction referring to the contract. If problems are found, report them to the PPK(CMO, Commitment Making Officer)
4.PAL Indonesia will immediately make a recovery plan for the frigate ship project.
5.Carry out coordination with the Ministry of Defense and the Indonesian Navy's Technical Directorate regarding the weapons that will be installed on the frigate, Prioritize those that have been proven.

6.Immediately implement contract amendments for equipment that undergoes changes.
7.For PT. PAL Indonesia will immediately carry out purchase orders for senkomlek (Communication & Electronic) equipment.

lets hope it does not ended up like malaysia LCS.
View attachment 61128
View attachment 61129
They are not speaking out the technical details, Babcock has granted the license right for two hulls and the modification was not spoken of. Likely Babcock is contracting modification related design work to subsidiaries or design offices in UK (maybe Indonesia, but haven't heard of it, please correct me if i am wrong), however as the details are not clear these works will not be completed in foreseeable time.

Yes the construction so far goes well, on paper, as they are manufacturing the common blocks that will not be subjected to the changes. (Or at least hoped to be so). However once they start to build aft and fore, or higher deck sections then they will need to wait for aforementioned detailing to be completed.

This is an old trick in shipbuilding that is applied in commercial shipbuilding as well, start construction from midship and doublebottom blocks, complete keel laying to have funding granted. Does not help for construction timeline, just provides a financial relief.
 

NEKO

Experienced member
Indonesia Correspondent
Messages
3,191
Reactions
4 2,819
Nation of residence
Indonesia
Nation of origin
Indonesia
The full system will be hosted on a 92.5 m mother ship designed by design and engineering group Houlder; the design package will be delivered to PT BTI for build in a local shipyard.

 

Mandala

Contributor
Indonesia Correspondent
Messages
886
Reactions
1 1,781
Nation of residence
Indonesia
Nation of origin
Indonesia

Follow us on social media

Top Bottom