Korea KF-X/ IF-X (KF-21) program

Passenger

Well-known member
Moderator
China Moderator
Messages
361
Reactions
8 678
Nation of residence
China
Nation of origin
China
I think that ROK has adopted an intelligent approach to developing KF-X. Design an airframe that can be converted to an IWB airframe without re-starting design from scratch, resulting in an aircraft that is very competitive cost-wise with sophisticated 4G fighters, then modify the design to give ROK air force a 5G fighter and address the 5G export market.

ROK could be selling a 4G Rafale/F-16 competitor for quite a few years and also a 5G competitor to F-35 (and KAAN and AMCA when they appear) for many more years.
Maybe it will be called as KF-35.
 

urban mine

Contributor
Messages
704
Reactions
60 1,570
Nation of residence
South Korea
Nation of origin
South Korea
Maybe it will be called as KF-35.
View attachment 80083 View attachment 80084 View attachment 80085
Future next-generation fighters may well be based on this testbed. Of course, the KF-21 probably won’t remain merely a 4.5-generation fighter either, but we’ll have to wait for the Air Force to make a clear statement before we can be sure.
 

urban mine

Contributor
Messages
704
Reactions
60 1,570
Nation of residence
South Korea
Nation of origin
South Korea
202604201808081799_l.jpg
2026042017371585995_l.jpg

Hanwha Systems announced on the 20th that it has signed its first mass production contract with Korea Aerospace Industries (KAI) for the Electro-Optical Target Acquisition and Tracking System (EOTGP) to be installed on the KF-21.

The contract is valued at approximately 92 billion won, and delivery is scheduled to be completed by November 30, 2028.
 

urban mine

Contributor
Messages
704
Reactions
60 1,570
Nation of residence
South Korea
Nation of origin
South Korea
View attachment 80143 View attachment 80144
Hanwha Systems announced on the 20th that it has signed its first mass production contract with Korea Aerospace Industries (KAI) for the Electro-Optical Target Acquisition and Tracking System (EOTGP) to be installed on the KF-21.

The contract is valued at approximately 92 billion won, and delivery is scheduled to be completed by November 30, 2028.
KakaoTalk_20260507_162203841.png

Block 2 is currently being tested. The EOTGP has been covered.
 
Top Bottom