A senior STM official said during an interview at IDEF that the conceptual design idea of the submarine came from a foreign country. As negotiations over the project continue, the details and characteristics of the boat may change in line with the requirements of the end user.


 

Combat-Master

Baklava Consumer
Moderator
Messages
3,667
Reactions
15 25,475
Nation of residence
United Kingdom
Nation of origin
Turkey
Untitled-2.png
 

AWP

Contributor
Messages
688
Reactions
4 1,410
Nation of residence
Canada
Nation of origin
Palestine
wouldn't tf-4500 frigate that was shown by stm in IDEF 2017 would fill the gab between istanbul class and tf2000 ? its actually fitting the requirements for TN that was shown by one of the members here .

TF-4500-01.png


also from what i understand that TN signed last year on august for 22-18 fast attack craft choosing FAC-55 by stm . so did it changed or what ?

STM_Fast_Attack_Craft_FAC-55.jpg
 

Anmdt

Experienced member
Naval Specialist
Professional
Messages
5,505
Solutions
2
Reactions
118 24,909
Nation of residence
Turkey
Nation of origin
Turkey
wouldn't tf-4500 frigate that was shown by stm in IDEF 2017 would fill the gab between istanbul class and tf2000 ? its actually fitting the requirements for TN that was shown by one of the members here .

TF-4500-01.png


also from what i understand that TN signed last year on august for 22-18 fast attack craft choosing FAC-55 by stm . so did it changed or what ?

STM_Fast_Attack_Craft_FAC-55.jpg
They did not choose FAC-55, in fact SSB has chosen STM as design contractor and signed to contract to work on the concept and now Navy PKO works with the STM on Turkish FAC. FAC-55 only demonstrates the design criterias of the Navy.

Concept wise yes, but TF-4500 hasn't had sufficient attention from TN. And i think Turkish Navy design office and armerkom would like to create the concept and then out-source the jobs when needed.
 

TR_123456

Experienced member
Staff member
Administrator
Messages
5,092
Reactions
12,704
Nation of residence
Nethelands
Nation of origin
Turkey
I have listed the total production units as the general target, bro, so I wrote Tf2000 as 4+4 but it is a very good list for the year 2035. In addition to 10 FACs (you wrote 14 FAC), new type of 6/7 FAC+ is a information or expectation bro? Btw, 6 Tf100 is logical number since Turkish fleet need expansion.
And no AC?
Your list shows a Green Water Navy.
 

Pilatino

Well-known member
Messages
338
Reactions
3 675
Nation of residence
Turkey
Nation of origin
Turkey
And no AC?
Your list shows a Green Water Navy.

My wishlist: 😊

Istif
Tf100 ( I'm sure we'll have 5000t ships)
Tf2000
(Tf4500 I'm sure after TF 2000 we'll build bigger destroyers named as guided missile destroyer)
TCG Anadolu and TCG Trakya (Trakya will be a pure ucav ship)
Milden Submarines
Annnnnnd the king 👑
TCG Kızılelma
pure blood aircraft carrier...
 

Combat-Master

Baklava Consumer
Moderator
Messages
3,667
Reactions
15 25,475
Nation of residence
United Kingdom
Nation of origin
Turkey
FERSAH Sonar System development activities started in 2018, will be integrated into BARBAROS class frigates (TCG BARBAROS, TCG ORUÇREİS, TCG SALİHREİS and TCG KEMALREİS) in addition to the I-Class Frigate (TCG İSTANBUL).

FERSAH.png
 

yusuf

Active member
Messages
118
Reactions
306
Nation of residence
Turkey
Nation of origin
Turkey
is fersah sonar system different from meteksan yakamoz sonar system?
 
T

Turko

Guest
I'm little bit confused with TF-100 class.

TF-100 class consists of F515, doesn't it?
So if we call F515 it means TF-100 class?
 

Cabatli_TR

Experienced member
Staff member
Administrator
Messages
5,360
Reactions
81 45,455
Nation of residence
Turkey
Nation of origin
Turkey
I'm little bit confused with TF-100 class.

TF-100 class consists of F515, doesn't it?
So if we call F515 it means TF-100 class?

Think of it this way, every new warship building project is being built to replace an existing fleet. Capacity increase and fleet growth also take place in this context. I class will replace the Yavuz class frigates. The Tf2000 will do the work of the 8 perry class, but a frigate will be required to replace the Barbaros MLU when its service term expires. We call it Tf100. The name may change in the future but in the end, this is how the mechanism works. @Anmdt
 

Knowledgeseeker

Experienced member
Moderator
Arab Moderator
Morocco Moderator
Messages
1,825
Reactions
20 4,654
Nation of residence
Norway
Nation of origin
Moroco
How fast does the turks build their corvettes and frigates? Im not fully sure but i read that tcg istanul f515 did launch january 2021, but are expected to be commisioned in 2023. What does that mean?
 

Tornadoss

Contributor
Messages
1,377
Reactions
4 2,627
Nation of residence
Czechia
Nation of origin
Turkey
How fast does the turks build their corvettes and frigates? Im not fully sure but i read that tcg istanul f515 did launch january 2021, but are expected to be commisioned in 2023. What does that mean?
It's because some subsystems are not ready yet such as VLS and its missiles. Originally there would be Mk41 but due to the US sanctions, we are developing our own.
 

Anmdt

Experienced member
Naval Specialist
Professional
Messages
5,505
Solutions
2
Reactions
118 24,909
Nation of residence
Turkey
Nation of origin
Turkey
How fast does the turks build their corvettes and frigates? Im not fully sure but i read that tcg istanul f515 did launch january 2021, but are expected to be commisioned in 2023. What does that mean?
Forever :) or simply check PN Milgem / Ukranian corvette schedule.
 

Knowledgeseeker

Experienced member
Moderator
Arab Moderator
Morocco Moderator
Messages
1,825
Reactions
20 4,654
Nation of residence
Norway
Nation of origin
Moroco
Forever :) or simply check PN Milgem / Ukranian corvette schedule.
I understand that some subsytem delay the project but hope they can speed it up when they have everything ready. The chinese built 80 navy ships in 8 years.. probably because they have everything ready, and have a good budget to.
 

Anmdt

Experienced member
Naval Specialist
Professional
Messages
5,505
Solutions
2
Reactions
118 24,909
Nation of residence
Turkey
Nation of origin
Turkey
I understand that some subsytem delay the project but hope they can speed it up when they have everything ready. The chinese built 80 navy ships in 8 years.. probably because they have everything ready, and have a good budget to.
Not the subsystems but the project managements, the project budgets are allocated one by one, thus orders made one by one, the contract stage keeps getting longer. You can not compare anyone to china, a country which allocates budget of flotilla at once and orders everything necessary at once. Their technique is not feasible to anyone but only them.
 