• Forum restore complete (see latest announcement thread)

Pakistan Pakistan Economy Updates

Fatman17

Experienced member
Moderator
Defence News Editor
Pakistan Moderator
Messages
2,650
Reactions
21 2,159
Nation of residence
Pakistan
Nation of origin
Pakistan
ISLAMABAD: Chashma Nuclear Power Plant Unit-1 (C-1) has operated safely and without interruption for 427 days during Cycle 18, setting a new record for the longest continuous operating cycle achieved by a nuclear power plant in the country’s history.

In a statement, the Pakistan Atomic Energy Commission (PAEC), which operates a fleet of six nuclear power plants, said the 325MW C-1 recorded uninterrupted operations, which was also accompanied by strong international performance indicators.

“C-1 achieved a World Association of Nuclear Operators (WANO) Performance Indicator Index score of 100 during each of the first two quarters of 2026, placing it among the leading nuclear power plants globally in terms of operational performance, reliability and safety,” the PAEC said.

The achievement reflected the technical expertise, discipline, and teamwork of the engineers, scientists, and other personnel at the Chashma Nuclear Power Generating Station (CNPGS), supported by ongoing guidance from the PAEC management and strict adherence to nuclear safety standards.
 

Fatman17

Experienced member
Moderator
Defence News Editor
Pakistan Moderator
Messages
2,650
Reactions
21 2,159
Nation of residence
Pakistan
Nation of origin
Pakistan
🇵🇰🛢 Pakistan launches $6 billion refinery modernization: What it means

Pakistan has taken a long-awaited step toward modernizing its aging oil refining infrastructure. Four of the country's five existing refineries — Attock Refinery, National Refinery, Cnergyico Pakistan, and Pakistan Refinery — have signed agreements with the state-designated entity Inter State Gas Systems (ISGS). Pak-Arab Refinery is expected to follow, according to the Pakistani publication Daily Times.

The agreements provide the contractual framework for a modernization program estimated at around $6 billion. The combined processing capacity of the five refineries is about 350,000 barrels per stream day, and implementation is expected to take up to five years.

👉 The project aims to produce cleaner Euro-V standard fuels, reduce lower-value furnace oil output, and replace some imported petroleum products with domestic production. This should lower Pakistan's reliance on imported petrol and diesel and strengthen the country's energy security.

Why does this matter now?

The US-Iran conflict has disrupted Middle Eastern energy supplies and shipping, driving up fuel costs in import-dependent Pakistan. Last year alone, the country spent $16.9 billion on petroleum imports. The modernization could eventually save up to $1.5 billion annually in foreign exchange — while also improving fuel quality and energy security.
HTEVA__WoAA5HeW.jpg

www.x.com
@sputniklnt
 
Top Bottom