Does the flight duration and altitude mean something significant?
 

Fatman17

Experienced member
Moderator
Defence News Editor
Pakistan Moderator
Messages
2,633
Reactions
21 2,147
Nation of residence
Pakistan
Nation of origin
Pakistan
KAAN'S great flight: The second test was a success

2nd successful flight
 

Rodeo

Contributor
DefenceHub Diplomat
Messages
1,330
Reactions
31 5,069
Nation of residence
Turkey
Nation of origin
Turkey

Zafer

Experienced member
Messages
5,654
Reactions
15 8,712
Nation of residence
Turkey
Nation of origin
Turkey
The foreign investors will rain on us once we have showed solid progress of TF-35K engine. Without it, KAAN is a high risk project even for us, let alone the not-aligned countries with the US.
Probably a lot of them will be sold upon seeing solid progress on even the TF6000.
 

duveil

Active member
Messages
42
Reactions
2 113
Nation of residence
Turkey
Nation of origin
Turkey
The foreign investors will rain on us once we have showed solid progress of TF-35K engine. Without it, KAAN is a high risk project even for us, let alone the not-aligned countries with the US.
Very true. To be honest , I would do the same. I hope we get results asap from TF-35K . I have question though. Lets say we have finished manufacturing the engine now how long do we need for testing before mass production?
 

Zafer

Experienced member
Messages
5,654
Reactions
15 8,712
Nation of residence
Turkey
Nation of origin
Turkey
Very true. To be honest , I would do the same. I hope we get results asap from TF-35K . I have question though. Lets say we have finished manufacturing the engine now how long do we need for testing before mass production?
Two to two and a half years.
 

IC3M@N FX

Contributor
Messages
701
Reactions
3 30 1,432
Nation of residence
Germany
Nation of origin
Turkey
There's no need to have any false illusions here - nothing will happen before 2029/30 with a prototype engine. Don't expect the first production Serial aircraft with their own functioning engine until 2032/33.
The validation and testing of a high-performance engine takes at least 3-4 years and an additional 1-2 years for flight tests.
I am sure that Block 0 and maybe 10 will still run with F119 engines.
 

Afif

Experienced member
Moderator
Bangladesh Correspondent
DefenceHub Diplomat
Bangladesh Moderator
Messages
5,139
Reactions
104 10,047
Nation of residence
Bangladesh
Nation of origin
Bangladesh
I am sure that Block 0 and maybe 10 will still run with F119 engines.

LoL, that would be great but USA isn't offering F119 for KAAN's serial production.
 

Huelague

Experienced member
Messages
5,381
Reactions
19 5,413
Nation of residence
Germany
Nation of origin
Turkey
Tomorrow I will call T.Kotil and ask for TVC and a stealth nozzle. And of course, more spped, up to Mach +2.
 

Afif

Experienced member
Moderator
Bangladesh Correspondent
DefenceHub Diplomat
Bangladesh Moderator
Messages
5,139
Reactions
104 10,047
Nation of residence
Bangladesh
Nation of origin
Bangladesh
About F119 engine intellectual property. Can we copy this engine legal?

It is not possible to copy F119. Besides, TEI doesn't have any experience with that.
 

Rodeo

Contributor
DefenceHub Diplomat
Messages
1,330
Reactions
31 5,069
Nation of residence
Turkey
Nation of origin
Turkey
I have question though. Lets say we have finished manufacturing the engine now how long do we need for testing before mass production?
We can't know the answer to that. It's uncharted territory for us. It could be 4 or 10. We'll have a better idea and do more informed guesses towards the end of this decade.
 

duveil

Active member
Messages
42
Reactions
2 113
Nation of residence
Turkey
Nation of origin
Turkey
Thanks everyone. I asked the question because I think there is a difference between what is advertised and what is technically possible. I believe that what Tusas achieved is very important and very good start for the future endeavors. But at the same time it is clearly just begining. We get ahead of our achievements like we have already succeded. Common people on the street think that we are just 3-4 years away from having operational Kaan with indigenous engine. I am very proud of what we achieved but also I am disturbed by the misleading news.
 
Top Bottom